flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The largest eSports stadium in North America opens in Arlington, Texas

Events Facilities

The largest eSports stadium in North America opens in Arlington, Texas

The project was a design-led design-build collaboration between Populous and Shawmut Design and Construction.


By David Malone, Associate Editor | November 27, 2018
The largest eSports stadium in North America opens in Arlington, Texas

Photo: Ross Stewart, courtesy Populous 

Competitive gaming (also known as eSports), the fastest growing spectator sport in the country, now has its largest, most robust venue in North America for fans to enjoy the action. Esports Stadium Arlington is a purpose-built eSports venue that will offer an immersive spectator experience in the live eSports event market.

The $10 million stadium is a renovation project that used 100,000 sf of the city’s old convention center. The new space includes a main competition arena with integrated player and competition screens; team areas with eight “Team Rooms”; a player lounge for players to relax and socialize; support areas; a gamer gallery; custom gaming modules for training; an outdoor terrace; staff offices and media space; and retail.

 

Photo: Ross Stewart, courtesy Populous

 

See Also: With a new type of stadium comes a new type of premium seat

 

The space is specifically designed to host eSports events with sightlines, screen sizes, and a player stage all tuned for competitive gaming events. For example, the main competition space features a built-in 85-foot-long LED wall accompanied by an immersive sound and theatrical lighting system. A broadcast studio equipped with Grass Valley systems and an analyst desk for real-time broadcasting allows events to be easily streamed around the world. The venue is highly adaptable and can host local and international events with audiences ranging from 250 to 2,500 people.

Esports Stadium Arlington celebrated its grand opening by hosting FACEIT’s Esports Championship Series Season 6 Finals, a $750,000 prize pool tournament held over Thanksgiving weekend.

 

Photo: Ross Stewart, courtesy Populous

 

Photo: Ross Stewart, courtesy Populous

Related Stories

| Mar 1, 2012

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 6, 2012

FMI releases 2012 Construction Productivity Report

Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

| Jan 3, 2012

The Value of Historic Paint Investigations

An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors. 

| Dec 27, 2011

Nova completes $60M Clearwater Conference Center

Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners

| Dec 27, 2011

BD+C's Under 40 Leadership Summit update

The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.

| Dec 14, 2011

Tyler Junior College and Sika Sarnafil team up to save energy

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021