Riverfront Square, a proposed 11.8-acre mixed-use development in Newark, N.J. will include a 500,000-sf timber office building. According to Michael Green Architecture, the building’s architect, and New York-based real estate development and investment firm Lotus Equity Group, the new structure would be the largest timber office building in the country when it completes construction.
Timber-built buildings are more environmentally friendly than buildings constructed with traditional materials. Manfactured steel and concrete, which are typically secondary materials within a mass timber building, account for an estimated 10% of greenhouse gas emissions worldwide. “The vision we share with Michael Green is to design the most environmentally sustainable office tower that enhances the health of tenants and the surrounding communities through efficient planning and green design,” says Ben Korman, Chief Executive Officer and Founder of Lotus Equity Group, in a release.
Courtesy Michael Green Architecture/Lotus Equity Group.
Riverfront Square is expected to provide up to 2,000 residential units, large- and small-scale retail, cultural and public open space, a hotel, 2 million sf of office space, and parking spaces in the heart of downtown Newark. The proposed site is adjacent to the waterfront and NJ Transit’s Broad Street train station, which can deliver riders to Midtown Manhattan in 18 minutes.
In an interview with BD+C this afternoon, Korman said his firm has been developing and building in Newark for a dozen years, and has a working partnership with the longtime owner of 2 Gateway Center, which at 800,000 sf is the city's largest office building. “We understand the dynamics and the history of Newark, and after analyzing the market came to the conclusion that the central business district was in need of significant housing.” He believes that Newark—which is among the 20 cities vying for Amazon's second headquarters—is poised for growth.
Courtesy Michael Green Architecture/Lotus Equity Group.
The decision to use mass timber for the office building was made, he said, about a year ago, “close to when we started the design process.” He said his firm “wanted [the building] to be a project of the future: affordable and sustainable, with a lower carbon footprint.” Lotus is also exploring using mass timber to build some of the residential component of Riverfront Square, too.
The 500,000-sf mass timber office building will be three interconnected sections, at heights of six, eight, and 11 stories, respectively. Amenities will include open spaces on the roof and ground floor of the building. In fact, five of Riverfront Square's 11.8 acres would be open space, some of which would connect with the city's existing parks.
Courtesy Michael Green Architecture/Lotus Equity Group.
Michael Green Architecture, based in Vancouver, B.C., has worked on several mass-timber projects, including the seven-story 220,000-sf T3 Minneapolis and the eight-story, 97-foot-tall Wood Innovation & Design Centre in Prince George, B.C. It is one of four architects with which Lotus is working on the Newark office project, the others being TEN Arquitectos, Practice for Architecture and Urbanism, and Minno & Wasko Architects and Planners.
Lotus needs to find a tenant before this project moves forward (it hasn't picked a general contractor yet, either). But when that happens construction should take about 20 months, said Korman, who added that the city of Newark is encouraging this kind of commercial and residential development. “They are a pleasure to do business with.”
Courtesy Michael Green Architecture/Lotus Equity Group.
Courtesy Michael Green Architecture/Lotus Equity Group.
Related Stories
Green | Jun 26, 2023
Federal government will spend $30 million on novel green building technologies
The U.S. General Services Administration (GSA), and the U.S. Department of Energy (DOE) will invest $30 million from the Inflation Reduction Act to increase the sustainability of federal buildings by testing novel technologies. The vehicle for that effort, the Green Proving Ground (GPG) program, will invest in American-made technologies to help increase federal electric vehicle supply equipment, protect air quality, reduce climate pollution, and enhance building performance.
Office Buildings | Jun 26, 2023
Electric vehicle chargers are top priority for corporate office renters
Businesses that rent office space view electric vehicle (EV) charging stations as a top priority. More than 40% of companies in the Americas and EMEA (Europe, the Middle East and Africa) are looking to include EV charging stations in future leases, according to JLL’s 2023 Responsible Real Estate study.
Laboratories | Jun 23, 2023
A New Jersey development represents the state’s largest-ever investment in life sciences and medical education
In New Brunswick, N.J., a life sciences development that’s now underway aims to bring together academics and researchers to work, learn, and experiment under one roof. HELIX Health + Life Science Exchange is an innovation district under development on a four-acre downtown site. At $731 million, HELIX, which will be built in three phases, represents New Jersey’s largest-ever investment in life sciences and medical education, according to a press statement.
Office Buildings | Jun 15, 2023
An office building near DFW Airport is now home to two Alphabet companies
A five-minute drive from the Dallas-Fort Worth International Airport, the recently built 2999 Olympus is now home to two Alphabet companies: Verily, a life sciences business, and Wing, a drone delivery company. Verily and Wing occupy the top floor (32,000 sf and 4,000 sf, respectively) of the 10-story building, located in the lakeside, work-life-play development of Cypress Waters.
Engineers | Jun 14, 2023
The high cost of low maintenance
Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.
Mixed-Use | Jun 12, 2023
Goettsch Partners completes its largest China project to date: a mixed-used, five-tower complex
Chicago-based global architecture firm Goettsch Partners (GP) recently announced the completion of its largest project in China to date: the China Resources Qianhai Center, a mixed-use complex in the Qianhai district of Shenzhen. Developed by CR Land, the project includes five towers totaling almost 472,000 square meters (4.6 million sf).
Mixed-Use | Jun 6, 2023
Public-private partnerships crucial to central business district revitalization
Central Business Districts are under pressure to keep themselves relevant as they face competition from new, vibrant mixed-use neighborhoods emerging across the world’s largest cities.
Energy-Efficient Design | Jun 5, 2023
Implementing an ‘asset drawdown strategy’ for site decarbonization
Solidifying a decarbonization plan via an “asset drawdown strategy” that carefully considers both capital and operating costs represents a game-changing opportunity for existing properties to compete with new projects.
Office Buildings | Jun 5, 2023
Office design in the era of Gen Z, AI, and the metaverse
HOK workplace and interior design experts Kay Sargent and Tom Polucci share how the hybrid office is evolving in the era of artificial intelligence, Gen Z, and the metaverse.
Urban Planning | Jun 2, 2023
Designing a pedestrian-focused city in downtown Phoenix
What makes a city walkable? Shepley Bulfinch's Omar Bailey, AIA, LEED AP, NOMA, believes pedestrian focused cities benefit most when they're not only easy to navigate, but also create spaces where people can live, work, and play.