flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

Mixed-Use

Las Vegas’ $7.9 billion ‘mini-city’ will be a ‘digital revolution in motion’

All of the project’s buildings will be net-zero.


By David Malone, Associate Editor | August 14, 2019

Courtesy Bleutech Properties

Set to break ground in December 2019 and take six years to build, Bleutech Park will be a $7.5 billion project that will be constructed of net-zero buildings within their own insular mini-city.

This mixed-use mini-city will feature automated multi-functional designs; renewable energies from solar, wind, water, and kinetic; autonomous vehicles; artificial intelligence; augmented reality; Internet of Things; robotics; supertrees; and self-healing concrete structures. Bleutech park will include workforce housing, offices, retail space, luxury  residential, hotel space, and entertainment space.

 

See Also: Calgary’s sports and entertainment district will include the Calgary Flames’ new arena

 

Workforce housing is Bleutech park’s new approach to tackling affordable housing. It will serve the housing needs of people employed in jobs that the general population relies upon to make the community economically viable, such as nurses, police officers, teachers, firemen, and others with a description of service to their communities.

In total, the project is expected to create over 25,000 jobs and provide on the job training programs to train the construction workforce of the future.

Tags

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021