flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Free registration for selected "young superstars" for BD+C's Under40 Leadership Summit in San Francisco, Oct 9-11, 2013


By By Robert Cassidy, Editorial Director | Rob Cassidy | October 1, 2013

BD+C's 3rd Annual Under40 Leadership Summit is just days away (Oct 9-11), and we'd like to make this great career development and learning opportunity available to a few more worthy young (under age 40) superstars in the design and construction industry.

Thanks to the generosity of our sponsors - Andersen Windows + Doors, The Vinyl Institute, American Institute of Steel Construction (AISC), Benjamin Moore, and Nichiha - we can offer FREE registrations (a $495 value) to 3 more young AEC professionals.

All you need to do is get to San Francisco by the afternoon of Wed., Oct 9, for our exclusive tour of Autodesk Gallery, followed by an evening of fun and discussion with Art Gensler, founder of the world's largest architecture firm, and the start of our Vision U40 Competition - with $5000 in prizes at stake, led by Autodesk Fellow Tom Wujec.

All that, plus our premier tour of the Mission Bay/UCSF mixed-use healthcare district on Friday - and don't forget the famous BD+C "Marshmallow Challenge," where teams of U40s will battle to build the largest structure they can from 20 sticks of spaghetti and a marshmallow (first rule: you can't eat the marshmallow).

Want to join us? Contact me, Rob Cassidy, Editorial Director: rcassidy@sgcmail.com; 847-391-1040.

See you in the City by the Bay!

-Robert Cassidy, Editorial Director

Related Stories

| Jun 1, 2012

AIA 2030 Commitment Program reports new results

The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.

| Jun 1, 2012

Robert Wilson joins SmithGroupJJR

Wilson makes the move to SmithGroupJJR from VOA Associates, Inc., where he served as a senior vice president and technical director in its Chicago office.

| Jun 1, 2012

Gilbane Building's Sue Klawans promoted

Industry veteran tasked with boosting project efficiency and driving customer satisfaction, to direct operational excellence efforts.

| Jun 1, 2012

Ground broken for Children’s Hospital Colorado South Campus

Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| Jun 1, 2012

New York City Department of Buildings approves 3D BIM site safety plans

3D BIM site safety plans enable building inspectors to take virtual tours of construction projects and review them in real-time on site.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 31, 2012

8 steps to a successful BIM marketing program

It's not enough to have BIM capability--you have to know how to sell your BIM expertise to clients and prospects.

| May 31, 2012

3 Metal Roofing Case Studies Illustrate Benefits

Metal roofing systems offer values such as longevity, favorable life cycle costs, and heightened aesthetic appeal.

| May 31, 2012

AIA Course: High-Efficiency Plumbing Systems for Commercial and Institutional Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021