flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Free registration for selected "young superstars" for BD+C's Under40 Leadership Summit in San Francisco, Oct 9-11, 2013


By By Robert Cassidy, Editorial Director | Rob Cassidy | October 1, 2013

BD+C's 3rd Annual Under40 Leadership Summit is just days away (Oct 9-11), and we'd like to make this great career development and learning opportunity available to a few more worthy young (under age 40) superstars in the design and construction industry.

Thanks to the generosity of our sponsors - Andersen Windows + Doors, The Vinyl Institute, American Institute of Steel Construction (AISC), Benjamin Moore, and Nichiha - we can offer FREE registrations (a $495 value) to 3 more young AEC professionals.

All you need to do is get to San Francisco by the afternoon of Wed., Oct 9, for our exclusive tour of Autodesk Gallery, followed by an evening of fun and discussion with Art Gensler, founder of the world's largest architecture firm, and the start of our Vision U40 Competition - with $5000 in prizes at stake, led by Autodesk Fellow Tom Wujec.

All that, plus our premier tour of the Mission Bay/UCSF mixed-use healthcare district on Friday - and don't forget the famous BD+C "Marshmallow Challenge," where teams of U40s will battle to build the largest structure they can from 20 sticks of spaghetti and a marshmallow (first rule: you can't eat the marshmallow).

Want to join us? Contact me, Rob Cassidy, Editorial Director: rcassidy@sgcmail.com; 847-391-1040.

See you in the City by the Bay!

-Robert Cassidy, Editorial Director

Related Stories

| Apr 2, 2012

Gilbane honored for sustainability efforts in Indianapolis

Emmitt J. Bean Federal Center project team for their role in advancing sustainability in the city.

| Apr 2, 2012

Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper

The operation of the elevator is scheduled to begin in 2014.

| Apr 2, 2012

Sachse Construction helps complete Salt Lake City’s City Creek Center

Sachse was hired to complete store build-outs at City Creek Center.

| Apr 2, 2012

Culver joins Sasaki as managing director

Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business development.

| Apr 2, 2012

EB-5 investment funds new Miramar, Fla. business complex

Riviera Point Holdings breaks ground on $17 million office center.

| Mar 30, 2012

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.

| Mar 30, 2012

18 handy tablet apps for AEC professionals

Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.

| Mar 29, 2012

U.K.’s Manchester Airport tower constructed in nine days

Time-lapse video shows construction workers on the jobsite for 222 continuous hours.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 29, 2012

Lehigh engineering student wins Thornton Tomasetti Foundation Awards Scholarship

The scholarship is awarded annually to a graduate student in structural engineering deemed by the department to have the potential to make an impact in the field professionally.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021