flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Free registration for selected "young superstars" for BD+C's Under40 Leadership Summit in San Francisco, Oct 9-11, 2013


By By Robert Cassidy, Editorial Director | Rob Cassidy | October 1, 2013

BD+C's 3rd Annual Under40 Leadership Summit is just days away (Oct 9-11), and we'd like to make this great career development and learning opportunity available to a few more worthy young (under age 40) superstars in the design and construction industry.

Thanks to the generosity of our sponsors - Andersen Windows + Doors, The Vinyl Institute, American Institute of Steel Construction (AISC), Benjamin Moore, and Nichiha - we can offer FREE registrations (a $495 value) to 3 more young AEC professionals.

All you need to do is get to San Francisco by the afternoon of Wed., Oct 9, for our exclusive tour of Autodesk Gallery, followed by an evening of fun and discussion with Art Gensler, founder of the world's largest architecture firm, and the start of our Vision U40 Competition - with $5000 in prizes at stake, led by Autodesk Fellow Tom Wujec.

All that, plus our premier tour of the Mission Bay/UCSF mixed-use healthcare district on Friday - and don't forget the famous BD+C "Marshmallow Challenge," where teams of U40s will battle to build the largest structure they can from 20 sticks of spaghetti and a marshmallow (first rule: you can't eat the marshmallow).

Want to join us? Contact me, Rob Cassidy, Editorial Director: rcassidy@sgcmail.com; 847-391-1040.

See you in the City by the Bay!

-Robert Cassidy, Editorial Director

Related Stories

| Nov 2, 2011

Mega deals drive 28% increase in global engineering and construction merger and acquisition value

Financial investors lead mega deal activity, China most active country in global domestic deals.

| Nov 2, 2011

Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.

307,000-sf building to be house to executive offices of Biogen Idec.

| Nov 2, 2011

CRSI’s Manual of Standard Practice now available

This resource contains information on recommended industry practices for estimating, detailing, fabricating, and placing reinforcing steel for reinforced concrete construction. 

| Nov 2, 2011

John W. Baumgarten Architect, P.C, wins AIA Long Island Chapter‘s Healthcare Award for Renovation

The two-story lobby features inlaid marble floors and wood-paneled wainscoting that pays homage to the building’s history.

| Nov 2, 2011

Jacobs announces acquisition of KlingStubbins

Jacobs Engineering Group Inc. announced that it has acquired KlingStubbins. Officials did not disclose the terms of the agreement. Jacobs' acquisition of KlingStubbins, which has approximately 500 employees located in the United States and Asia, particularly enhances the Company's capabilities in design. KlingStubbins provides professional services in planning, architecture, engineering and interiors.

| Nov 1, 2011

Perkins Eastman opens office in San Francisco

Located at 23 Geary Street in the One Kearny building, the 8,100 sf office will accommodate a growing staff of 45.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Nov 1, 2011

Holcim awards winners for North America announced

A socio-architectural project to create regional food-gathering nodes and a logistics network in Canada's high arctic territory won the top prize for North America of $100,000.

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021