flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At last, downtown Dallas tower to get $450 million redo

Multifamily Housing

At last, downtown Dallas tower to get $450 million redo

Landmark tower, vacant for a decade, will get a mix of apartments, hotel, restaurants, and retail.


By By Robert Cassidy, Editor, Multifamily Design+Construction | May 17, 2019

A crew from Andres Construction Services performs work on the adaptive reuse of First National Bank Tower, Dallas, into apartments, restaurants, retail, and the 200-room Texas flagship inn for Thompson Hotels. Photo: Andres Construction Services

After a decade of starts and stops, the 1.5 million-sf First National Bank Tower—which occupies the largest vacant block in the core of downtown Dallas—is to be redeveloped. Todd Interests is the new developer. Andres Construction Services is the GC. Merriman Anderson Architects is the design firm.

Work on the 52-story tower at 1401 Elm Street quietly began ramping back up in recent days, while the deal with Todd Interests was still being ironed out. That’s because the project must hit a completion target of year-end 2020 to qualify for millions in entitlements.

According to a May 8, 2019, report by Jeremiah Jensen in Commercial Real Estate, the redevelopment will focus on four uses: apartments, hotel, restaurants, and retail. A 200-room hotel, which will serve as a Texas flagship for Thompson Hotels, is scheduled to open in September 2020. The residential component will feature 318 luxury apartments, including some on the 48th floor—the highest in downtown Dallas.

The landmark tower has been vacant for a decade, according to a report by Steve Brown, RE Editor of the Dallas News. Todd Interests is the fifth owner to tackle redevelopment of the 1960s office tower, which is the largest empty building downtown.

Related Stories

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 19, 2012

Rental market pushing service, ‘community’

The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 2, 2012

Building Team completes two additions at UCLA

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021