The U.S. Green Building Council (USGBC) has opened the first public comment period for the first draft of LEED v5.
The new version of the LEED green building rating system will drive deep decarbonization, quality of life improvements, and ecological conservation and restoration, USGBC says. New emphasis will be placed on:
• Decarbonization: Focus on reductions of all significant sources of emissions: operational, embodied, refrigerants and transportation.
• Quality of life: The use of human-centric strategies to improve health and wellbeing, resilience, and equity and inclusion for building occupants and their communities.
• Ecological conservation and restoration: Emphasis on strategies and actions that can be implemented at the individual asset level to limit environmental degradation and contribute towards the restoration of ecosystems.
LEED v5 emphasizes impact, alignment, and interconnectedness to support initial and ongoing sustainability efforts throughout a building’s lifecycle. LEED v5 Operations + Maintenance puts existing buildings on a path to decarbonization and ties Platinum-level certification to near-zero carbon operating emissions.
LEED v5 Building Design + Construction provides a framework for new buildings to reach near-zero carbon emissions operationally by 2050 on a decarbonized grid. At the Platinum level, new buildings will be poised to achieve near-zero carbon operationally and embodied carbon reductions today.
Related Stories
| Nov 1, 2022
Updated Florida building codes helped newer homes withstand Hurricane Ian
Newer homes seemed to fare much better than older structures during Hurricane Ian, suggesting that updated Florida building codes made a difference.
Wood | Nov 1, 2022
A European manufacturer says its engineered wood products can store carbon for decades
Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change.
Data Centers | Oct 31, 2022
Data center construction facing record-breaking inflation, delays
Data center construction projects face record-breaking inflation amid delays to materials deliveries and competition for skilled labor, according to research from global professional services company Turner & Townsend.
School Construction | Oct 31, 2022
Claremont McKenna College science center will foster integrated disciplinary research
The design of the Robert Day Sciences Center at Claremont McKenna College will support “a powerful, multi-disciplinary, computational approach to the grand socio-scientific challenges and opportunities of our time—gene, brain, and climate,” says Hiram E. Chodosh, college president.
Energy Efficient Roofing | Oct 28, 2022
Rooftop mini turbines can pair with solar panels
A new type of wind turbine can pair well on roofs with solar panels, offering a double source of green energy generation for buildings.
Contractors | Oct 28, 2022
How bulletproof is your construction contract?
Three Dykema Gossett attorneys discuss how supply-chain problems are complicating these agreements.
Building Team | Oct 27, 2022
Who are you? Four archetypes shaping workspaces
The new lifestyle of work requires new thinking about the locations where people work, what their workflow looks like, and how they are performing their best work.
Codes and Standards | Oct 27, 2022
Florida’s Surfside-inspired safety law puts pressure on condo associations
A Florida law intended to prevent tragedies like the Surfside condominium collapse will place a huge financial burden on condo associations and strain architecture and engineering resources in the state.
University Buildings | Oct 27, 2022
The Collaboratory Building will expand the University of Florida’s School of Design, Construction, and Planning
Design firm Brooks + Scarpa recently broke ground on a new addition to the University of Florida’s School of Design, Construction, and Planning (DCP).
Codes and Standards | Oct 26, 2022
‘Landmark study’ offers key recommendations for design-build delivery
The ACEC Research Institute and the University of Colorado Boulder released what the White House called a “landmark study” on the design-build delivery method.