flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lendlease to build Aykon London One Tower

High-rise Construction

Lendlease to build Aykon London One Tower

Damac, the Dubai-based developer of the project, selected the Australian property construction and development company to build the tower.


By David Malone, Associate Editor | September 8, 2016

Image courtesy of Kohn Pedersen Fox

Aykon London One Tower, a new residential tower designed by Kohn Pedersen Fox Associates, is set to rise 50-stories above London and offer 450 total residential units.

The project, which marks the first international development outside of the Middle East for Damac Properties, has a total development value of $844 million. $264 million of that total has been put towards a contract with the Australia-based company Lendlease to build the project.

London One will be located in the Nine Elms district, near the former Battersea Power Station building, and will overlook the south bank of the River Thames. Of the 450 units comprised within the building, 360 will be luxury units with a starting price of $1.2 million. The other 90 will be set aside as affordable units. Additionally, four stories have been earmarked as office space.

Despite the fact that a report from London’s property market adviser London Central Portfolio pointed to the number of new apartments being sold in London as declining, Damac believes there will be no issues with filling the tower, according to The National.

The first phase of Aykon London One accounted for about 40 percent of the total rooms available and has already sold out. The company believes it will see the same result for the next phase of units, which is expected to launch imminently.

Related Stories

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 18, 2011

Michel Bruneau wins 2012 AISC T.R. Higgins Award

The AISC T.R. Higgins Lectureship Award is presented annually by the American Institute of Steel Construction (AISC) and recognizes an outstanding lecturer and author whose technical paper(s) are considered an outstanding contribution to the engineering literature on fabricated structural steel. 

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021