flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

London grows up: 236 tall buildings to be added to skyline in coming decade, says think tank

London grows up: 236 tall buildings to be added to skyline in coming decade, says think tank

The vast majority of high-rise projects in the works are residential towers, which could help tackle the city's housing crisis.


By New London Architecture | March 12, 2014
Image credit: Copyright CPAT / Hayes Davidson / Jason Hawkes
Image credit: Copyright CPAT / Hayes Davidson / Jason Hawkes

The think tank New London Architecture (NLA) has released the results of an independent survey to uncover the number of towers planned for the capital and how this will affect the people who live and work in the city.

As part of a major NLA Insight Study into the past, present, and future of tall towers in the capital and NLA exhibition London’s Growing Up!, which opens next month, the survey by GL Hearn has found at least 236 tall buildings over 20 storys are currently proposed, approved, or under construction in London, and set to dramatically alter the capital’s skyline. Initial estimates had originally placed the figure at 200.

This new trend for tall buildings will see 33 buildings between 40 and 49 storys and 22 buildings of 50 storys or more planned for London.

About half (48%) of the 236 towers have been approved and 19% are already off the starting blocks and under construction.

High-rise living sees the biggest surge, with 80% of the towers planned as new residential blocks for the capital—a total of 189 new towers, potentially contributing to tackling London’s housing crisis.

Tower Hamlets, traditionally one of London’s less affluent boroughs, is at the heart of the building boom as the biggest area of development, with 23% of the projects being planned there alone.

Central and East London are the focus areas for the most future developments, with 77% of the total planned tall buildings. Tower Hamlets, Lambeth, Greenwich, Newham, and Southwark have a combined total of 140 new towers, out of the proposed 236.

Of the remaining towers, 18 are set to be office developments, eight hotels, 13 mixed-use, and one tower is earmarked as an educational institute.

The results of GL Hearn’s building survey will inform the NLA Insight Study which investigates the past, present, and future London skyline.

 

Status of tall building development projects
113 (48%) of development projects approved
72 (30%) proposed applications
45 (19%) under construction
6 (3%) unknown

Primary use of tall building development projects reviewed
189 (80%) of development projects have a primary residential use
18 (8%) of development projects have an primary office use
8 (3%) of development projects have a primary hotel use
Only 13 (6%) of development projects have a primary mixed-use
Only 1 (0.4%) of development projects have a primary University/Educational Institution use

Analysis of London's five sub-regions
East: 107 projects
Central: 76
South and North: 22 each
West: 10

 

About NLA — London’s Centre for the Built Environment
NLA was founded in 2005 to provide an independent information resource and a forum for discussion and debate about London’s built environment for professionals, public and politicians. Since that time it has successfully established itself as a major focus for discussion about architecture, planning, development and construction in the capital with a yearround program of events, publications and exhibitions, and a core mission – bringing people and ideas together to shape a better city.

About the London’s Growing Up! exhibition
London’s Growing Up! is a free exhibition and is on show at NLA’s galleries at The Building Centre, 26 Store Street, London WC1E 7BT from April 3 to June 12. Through the use of images, video, models, CGIs and visitor interaction, the exhibition will present a past, present and future view of London’s skyline as the capital’s developers focus on building upwards, rather than outwards.

Related Stories

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 16, 2010

Where can your firm beat the recession? Try any of these 10 places

Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.

| Nov 16, 2010

Landscape architecture challenges Andrés Duany’s Congress for New Urbanism

Andrés Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision,  and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that there’s a societal buyer’s remorse about New Urbanism, Duany is coming up against a movement that sees landscape architecture—not architecture—as the design medium more capable of organizing the city and enhancing the urban experience.

| Nov 16, 2010

Just for fun: Words that architects use

If you regularly use such words as juxtaposition, folly, truncated, and articulation, you may be an architect. Architects tend to use words rarely uttered during normal conversations. In fact, 62% of all the words that come out of an architects mouth could be replaced by a simpler and more widely known word, according to this “report.” Review this list of designer words, and once you manage to work them into daily conversation, you’re on your way to becoming a bonafide architect.

| Nov 16, 2010

NFRC approves technical procedures for attachment product ratings

The NFRC Board of Directors has approved technical procedures for the development of U-factor, solar heat gain coefficient (SHGC), and visible transmittance (VT) ratings for co-planar interior and exterior attachment products. The new procedures, approved by unanimous voice vote last week at NFRC’s Fall Membership Meeting in San Francisco, will add co-planar attachments such as blinds and shades to the group’s existing portfolio of windows, doors, skylights, curtain walls, and window film.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021