The think tank New London Architecture (NLA) has released the results of an independent survey to uncover the number of towers planned for the capital and how this will affect the people who live and work in the city.
As part of a major NLA Insight Study into the past, present, and future of tall towers in the capital and NLA exhibition London’s Growing Up!, which opens next month, the survey by GL Hearn has found at least 236 tall buildings over 20 storys are currently proposed, approved, or under construction in London, and set to dramatically alter the capital’s skyline. Initial estimates had originally placed the figure at 200.
This new trend for tall buildings will see 33 buildings between 40 and 49 storys and 22 buildings of 50 storys or more planned for London.
About half (48%) of the 236 towers have been approved and 19% are already off the starting blocks and under construction.
High-rise living sees the biggest surge, with 80% of the towers planned as new residential blocks for the capital—a total of 189 new towers, potentially contributing to tackling London’s housing crisis.
Tower Hamlets, traditionally one of London’s less affluent boroughs, is at the heart of the building boom as the biggest area of development, with 23% of the projects being planned there alone.
Central and East London are the focus areas for the most future developments, with 77% of the total planned tall buildings. Tower Hamlets, Lambeth, Greenwich, Newham, and Southwark have a combined total of 140 new towers, out of the proposed 236.
Of the remaining towers, 18 are set to be office developments, eight hotels, 13 mixed-use, and one tower is earmarked as an educational institute.
The results of GL Hearn’s building survey will inform the NLA Insight Study which investigates the past, present, and future London skyline.
Status of tall building development projects
113 (48%) of development projects approved
72 (30%) proposed applications
45 (19%) under construction
6 (3%) unknown
Primary use of tall building development projects reviewed
189 (80%) of development projects have a primary residential use
18 (8%) of development projects have an primary office use
8 (3%) of development projects have a primary hotel use
Only 13 (6%) of development projects have a primary mixed-use
Only 1 (0.4%) of development projects have a primary University/Educational Institution use
Analysis of London's five sub-regions
East: 107 projects
Central: 76
South and North: 22 each
West: 10
About NLA — London’s Centre for the Built Environment
NLA was founded in 2005 to provide an independent information resource and a forum for discussion and debate about London’s built environment for professionals, public and politicians. Since that time it has successfully established itself as a major focus for discussion about architecture, planning, development and construction in the capital with a yearround program of events, publications and exhibitions, and a core mission – bringing people and ideas together to shape a better city.
About the London’s Growing Up! exhibition
London’s Growing Up! is a free exhibition and is on show at NLA’s galleries at The Building Centre, 26 Store Street, London WC1E 7BT from April 3 to June 12. Through the use of images, video, models, CGIs and visitor interaction, the exhibition will present a past, present and future view of London’s skyline as the capital’s developers focus on building upwards, rather than outwards.
Related Stories
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.