flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Los Angeles has plan to improve stormwater capture and source 80% of water locally

Sustainability

Los Angeles has plan to improve stormwater capture and source 80% of water locally

Water sourced from outside area has become less reliable due to climate change, water scarcity


By Peter Fabris, Contributing Editor | January 2, 2024
Los Angeles has plan to improve stormwater capture and source 80% of water locally - Image by Maxx Girr from Pixabay
Image by Maxx Girr from Pixabay

Los Angeles County’s Board of Supervisors voted for a plan to improve stormwater capture with a goal of capturing it for local reuse.

The plan aims to increase the local water supply by 580,000 acre-feet per year by 2045. The county will use this volume of water to supplant water imported from other regions so that 80% of the water supply will be sourced locally.

Water supply from other regions has become less reliable due to climate change and water scarcity. The plan could increase the local supply by about 162 billion gallons and service 5 million more people.

The plan addresses long-standing droughts in the county including a severe drought in 2012 to 2016 and another drought in 2021 to 2022. 

The plan contains 14 strategies to increase stormwater capture and local water supply by 2045, including reducing water usage, improving drought preparedness and messaging, leveraging groundwater storage potential, making pumping and treating groundwater more cost-effective, and managing invasive species and wildfires that impact water supply and water quality.

Related Stories

Wood | Oct 24, 2019

Could mass timber be a game changer for stadium design?

Projects throughout the U.S. and Canada showcase the design and environmental traits of large-scale wood sports facilities. 

Sustainability | Aug 15, 2019

Paris will soon be home to the world’s largest rooftop farm

Agripolis is spearheading the project.

Sustainability | Jun 7, 2019

Workplace wellness: Top 3 tips for Fitwel certification

How can thoughtful design encourage healthier choices, lifestyles, and work environments?

Sustainability | May 28, 2019

Carrier’s world headquarters in Florida goes green

The structure is the first commercial building in Florida to achieve LEED Platinum v4 Certification.

Resiliency | Apr 22, 2019

Turner Construction doubles down on jobsite efficiency

The company targets a 50% cut in greenhouse gas emissions and water use from construction activities by 2030.

Sustainability | Apr 5, 2019

BIG unveils vision for a sustainable, floating city

The project is dubbed Oceanix City.

Sustainability | Mar 25, 2019

This is the world’s first Sustainable SITES Initiative v2 Platinum project

The building is part of the Phipps Conservatory and Botanical Gardens in Pittsburgh.

Sustainability | Feb 20, 2019

Studio NAB’s Superfarm project creates an entire ecosystem in an urban environment

The Superfarm will go beyond what vertical farms typically produce.

Sustainability | Feb 11, 2019

AEC firms practice what they preach

The advice about wellness firms dispense to clients in many cases has already been road tested to make their own workplaces healthier.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021