flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Louisiana flood projections require urgent action, officials say

Codes and Standards

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.


By Peter Fabris, Contributing Editor | November 9, 2016

Pixabay Public Domain

Louisiana officials are revising the master plan for combating flooding and storm surge damage and have abandoned the projection of no net loss of land by 2035.

The new master plan, to be released in 2017, is more pessimistic than the 2012 version. State officials had thought they could stabilize land loss in the next 20 years, and then be able to add land to the coast. They now say it would take much longer to break even, and that goal may be unrealistic.

New research shows that the rates of land loss and sea level rise rise will be far greater during the last 20 years of the 50-year plan than during the first two decades. Thus, the 2017 master plan, and any work done in the next 20 years is extremely urgent.

Officials will soon announce a list of as many as 200 projects that they will include in the 2017 plan. The plan will include initiatives to build wetlands and land, build and raise levee systems across the state, and raise or relocate homes and businesses still threatened by surges and sea level rise.

Related Stories

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

| Apr 19, 2012

CSI webinar on energy codes and building envelopes

This seminar will review recent changes in energy codes, examples of building enclosure wall assemblies for code compliance, potential moisture management and durability challenges, and design tools to assess and minimize potential problems.

| Apr 19, 2012

Innovative plan for storm water in Philadelphia gets EPA’s OK

Philadelphia's $2 billion plan to manage its storm water with green methods including porous pavement, green roofs, and more trees, was officially approved last week by the U.S. Environmental Protection Agency.

| Apr 19, 2012

LEED 2012 to include new credit category for transit-oriented development

The updated LEED 2012 system will introduce a new credit category, “Location and Transportation,” to encourage development oriented around public transit and more walkable communities.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 13, 2012

Congress’s action doesn’t mean Pentagon can’t build LEED gold structures

Though Congress passed a defense budget preventing the Department of Defense from spending money to achieve LEED gold or platinum certification, the Pentagon may still end up constructing buildings to those standards.

| Apr 13, 2012

International Living Building Institute certifies first two Net Zero Energy buildings

A community building in Oregon and an office building in California are the first two projects to earn net-zero status under the International Living Building Institute’s Net Zero Energy Certification program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021