flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Louisiana flood projections require urgent action, officials say

Codes and Standards

Louisiana flood projections require urgent action, officials say

The 'no net loss’ prediction now seems unrealistic.


By Peter Fabris, Contributing Editor | November 9, 2016

Pixabay Public Domain

Louisiana officials are revising the master plan for combating flooding and storm surge damage and have abandoned the projection of no net loss of land by 2035.

The new master plan, to be released in 2017, is more pessimistic than the 2012 version. State officials had thought they could stabilize land loss in the next 20 years, and then be able to add land to the coast. They now say it would take much longer to break even, and that goal may be unrealistic.

New research shows that the rates of land loss and sea level rise rise will be far greater during the last 20 years of the 50-year plan than during the first two decades. Thus, the 2017 master plan, and any work done in the next 20 years is extremely urgent.

Officials will soon announce a list of as many as 200 projects that they will include in the 2017 plan. The plan will include initiatives to build wetlands and land, build and raise levee systems across the state, and raise or relocate homes and businesses still threatened by surges and sea level rise.

Related Stories

| Mar 8, 2012

Federal silica dust rule caught in bureaucratic limbo

A federal rule meant to protect the lungs of workers has been caught in bureaucratic purgatory for more than a year.

| Mar 8, 2012

New LEED-EBOM rating has requirements for specific project types

Several key changes are proposed for the LEED-EBOM Rating System in 2012.

| Mar 8, 2012

Green buildings more resilient than conventionally built structures

A new study by the U.S. Green Building Council (USGBC) and the University of Michigan’s Taubman College of Architecture and Urban Planning suggests that structures built to green standards can advance building resiliency.

| Mar 1, 2012

LEED Platinum standard likely to mean net-zero energy by 2018

As LEED standards continue to rise, the top level, LEED Platinum, will likely mean net-zero energy construction by 2018.

| Mar 1, 2012

EPA beefs up stormwater discharge rule from construction projects

The U.S. Environmental Protection Agency (EPA) has now finalized its 2012 construction general permit (CGP) that authorizes stormwater discharges from construction projects that disturb one or more acres of land in the areas where EPA is the permitting authority.

| Mar 1, 2012

Regulators investigate structural failures during construction of two Ohio casinos

Regulators with the Occupational Safety & Health Administration and the city of Cincinnati are investigatingthe collapse of the second floor of Cincinnati's Horseshoe Casino as workers were pouring concrete.

| Mar 1, 2012

Is your project too small for LEED? Consider other green standards

There are many other recognized national, state and local programs that offer a variety of best management practices and sustainable design, construction and operating strategies.

| Mar 1, 2012

California bill aims to cut costs for commercial building energy retrofits

A bill in the California Assembly would allow the state to pool together property owners’ energy-retrofit loans.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021