In the three months ended July 31, the home-improvement retailer Lowe’s reported a 135% increase in its ecommerce sales compared to the same period a year earlier. And it’s not like ecommerce was stealing business from its nearly 2,000 stores, which reported a 30% quarterly sales gain.
Some of this is COVID-enabled, of course, as homeowners stuck in their houses because of the pandemic are repairing and remodeling with fervor. But since joining the company two years ago, Lowe’s CEO Marvin Ellison has been modernizing and expanding the retailer’s ecommerce business. That effort has included the expansion of Lowe’s warehousing and delivery infrastructure.
The year Ellison came on board, Lowe’s announced a $1.7 billion investment through 2023 to expand its supply-chain network. In the proceeding 18 months, it opened more than 13 different facilities in markets such as Chicago, Orlando, Riverside, Calif., and Columbus, Ohio.
That plan continued last month, when Lowe’s opened a West Coast ecommerce fulfillment center in Mira Loma, Calif., the first of four such centers that the retailer intends to open by the end of next year. Mira Loma—a four-building campus with 2.2 million sf—improves two-day delivery options for 100% of the retailer’s customers across the country. (Lowe’s opened its first ecommerce fulfillment center in Nashville in 2018.)
Lowe’s has also leased space in an industrial park in Gilbert, Ariz., and 1.2 million sf at the Benaroya Pacific Northwest Regional Logistics Center in Winlock, Wash. The Gilbert lease is for a 101,000-sf crossdock terminal run by a third party that's expected to start shipping early next year. The Winlock will serve as a bulk distribution center that is scheduled to become operable in the fall of 2021 and replenish bulky items like riding mowers, grills and patio furniture to Lowe's crossdock facilities for more than 60 stores in Washington, Alaska, Oregon, Idaho, and Montana.
MORE CROSSDOCK TERMINALS AND WAREHOUSES
Earlier this month, Lowe’s revealed that it would lease 1.1 million square feet for an ecommerce fulfillment center in Shippensburg, Pa., which is expected to start operations next spring. The lease, from Equus Capital Partners, is for 10 years. The building—with 189 docks, 631 trailer spaces, and parking for 250—will speed deliveries to ecommerce customers in the Northeast. In 2019, Lowe’s opened a 1.2-million-sf warehouse in Shippensburg that supports more than 130 of its stores in seven Northeastern states.
Through the end of next year, Lowe’s intends to open 50 cross-dock delivery terminals and four bulk distribution centers. A 92,000-sf crossdock terminal in Greenwood, Ind., will handle bulky items and is expected to start shipping by the end of this year. The retailer announced last week that it would contract with an affiliate of the developer-builder Clayco to construct a $61 million, 1.2-million-sf distribution center on 96 acres in Bessemer, Ala. This facility will warehouse bulk products like appliances and support 112 of Lowe’s stores in the Southeast.
Shipments from this DC are expected to begin in the fall of 2021. It is projected to add 150 jobs to the area. Lowe’s will lease back this DC from Clayco.
The Birmingham (Ala.) Business Alliance reportedly spearheaded this project, which “promotes Bessemer to a national audience as a place where ecommerce and distribution and logistics companies can thrive,” said Jeff Traywick, vice president of economic development at the BBA.
Editor's note: After this story was posted, more details about Lowe's new facilities were added.
Related Stories
| Sep 19, 2013
6 emerging energy-management glazing technologies
Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level.
| Sep 19, 2013
Roof renovation tips: Making the choice between overlayment and tear-off
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing roof or to overlay the new roof right on top of the old one. Roofing experts offer guidance on making this assessment.
Smart Buildings | Sep 13, 2013
Chicago latest U.S. city to mandate building energy benchmarking
The Windy City is the latest U.S. city to enact legislation that mandates building energy benchmarking and disclosure for owners of large commercial and residential buildings.
| Sep 13, 2013
Chicago latest U.S. city to mandate building energy benchmarking
The Windy City is the latest U.S. city to enact legislation that mandates building energy benchmarking and disclosure for owners of large commercial and residential buildings.
| Sep 11, 2013
BUILDINGChicago eShow Daily – Day 3 coverage
Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 3, 2013
Delinquency rate for commercial real estate loans at lowest level in three years
The delinquency rate for US commercial real estate loans in CMBS dropped for the third straight month to 8.38%. This represents a 10-basis-point drop since July's reading and a 175-basis-point improvement from a year ago.
| Aug 30, 2013
Local Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest local government design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 30, 2013
State Government Report [2013 Giants 300 Report]
Stantec, Jacobs, PCL Construction among nation's top state government design and construction firms, according to BD+C's 2013 Giants 300 Report.
| Aug 28, 2013
Federal Government Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest federal government design and construction firms, as reported in the 2013 Giants 300 Report.