flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lowe’s rides ecommerce wave by expanding its distribution and delivery capacities

Warehouses

Lowe’s rides ecommerce wave by expanding its distribution and delivery capacities

The retail giant will also open four more bulk warehouses, including a 1.2-million-sf DC in Alabama it is building with Clayco.


By John Caulfield, Senior Editor | November 9, 2020

Lowe's is leasing and building distribution and fulfillment centers to support both its stores across the country and its burgeoning ecommerce business. Image: Spectrum News 1 (North Carolina

In the three months ended July 31, the home-improvement retailer Lowe’s reported a 135% increase in its ecommerce sales compared to the same period a year earlier. And it’s not like ecommerce was stealing business from its nearly 2,000 stores, which reported a 30% quarterly sales gain.

Some of this is COVID-enabled, of course, as homeowners stuck in their houses because of the pandemic are repairing and remodeling with fervor. But since joining the company two years ago, Lowe’s CEO Marvin Ellison has been modernizing and expanding the retailer’s ecommerce business. That effort has included the expansion of Lowe’s warehousing and delivery infrastructure.

The year Ellison came on board, Lowe’s announced a $1.7 billion investment through 2023 to expand its supply-chain network. In the proceeding 18 months, it opened more than 13 different facilities in markets such as Chicago, Orlando, Riverside, Calif., and Columbus, Ohio.

That plan continued last month, when Lowe’s opened a West Coast ecommerce fulfillment center in Mira Loma, Calif., the first of four such centers that the retailer intends to open by the end of next year. Mira Loma—a four-building campus with 2.2 million sf—improves two-day delivery options for 100% of the retailer’s customers across the country. (Lowe’s opened its first ecommerce fulfillment center in Nashville in 2018.) 

Lowe’s has also leased space in an industrial park in Gilbert, Ariz., and 1.2 million sf at the Benaroya Pacific Northwest Regional Logistics Center in Winlock, Wash. The Gilbert lease is for a 101,000-sf crossdock terminal run by a third party that's expected to start shipping early next year. The Winlock will serve as a bulk distribution center that is scheduled to become operable in the fall of 2021 and replenish bulky items like riding mowers, grills and patio furniture to Lowe's crossdock facilities for more than 60 stores in Washington, Alaska, Oregon, Idaho, and Montana.

MORE CROSSDOCK TERMINALS AND WAREHOUSES

Earlier this month, Lowe’s revealed that it would lease 1.1 million square feet for an ecommerce fulfillment center in Shippensburg, Pa., which is expected to start operations next spring. The lease, from Equus Capital Partners, is for 10 years. The building—with 189 docks, 631 trailer spaces, and parking for 250—will speed deliveries to ecommerce customers in the Northeast. In 2019, Lowe’s opened a 1.2-million-sf warehouse in Shippensburg that supports more than 130 of its stores in seven Northeastern states.

Through the end of next year, Lowe’s intends to open 50 cross-dock delivery terminals and four bulk distribution centers. A 92,000-sf crossdock terminal in Greenwood, Ind., will handle bulky items and is expected to start shipping by the end of this year. The retailer announced last week that it would contract with an affiliate of the developer-builder Clayco to construct a $61 million, 1.2-million-sf distribution center on 96 acres in Bessemer, Ala. This facility will warehouse bulk products like appliances and support 112 of Lowe’s stores in the Southeast.

Shipments from this DC are expected to begin in the fall of 2021. It is projected to add 150 jobs to the area. Lowe’s will lease back this DC from Clayco.

The Birmingham (Ala.) Business Alliance reportedly spearheaded this project, which “promotes Bessemer to a national audience as a place where ecommerce and distribution and logistics companies can thrive,” said Jeff Traywick, vice president of economic development at the BBA.

Editor's note: After this story was posted, more details about Lowe's new facilities were added.

Related Stories

| Jul 18, 2013

GSA regains stature under Tangherlini, who looks to trim its holdings, cut energy costs [2013 Giants 300 Report]

Over the past 15 months, Acting GSA Administrator Dan Tangherlini has done a creditable job of restoring the agency’s standing with Congress and the public.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

| Jun 28, 2013

Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report

A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals. 

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 3, 2013

Construction spending inches upward in April

The U.S. Census Bureau of the Department of Commerce announced today that construction spending during April 2013 was estimated at a seasonally adjusted annual rate of $860.8 billion, 0.4 percent above the revised March estimate of $857.7 billion.

| May 3, 2013

'LEED for all GSA buildings,' says GSA Green Building Advisory Committee

The Green Building Advisory Committee established by the General Services Administration, officially recommended to GSA that the LEED green building certification system be used for all GSA buildings as the best measure of building efficiency.

| May 1, 2013

Data center construction remains healthy, but oversupply a concern

Facebook, Amazon, Microsoft, and Google are among the major tech companies investing heavily to build state-of-the-art data centers.

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Apr 24, 2013

Los Angeles may add cool roofs to its building code

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is also asking the Department of Water and Power (LADWP) to create incentives that make it financially attractive for homeowners to install cool roofs.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021