MAD Architects has unveiled the “Train Station in the Forest,” a new project that covers an area of 35.4 hectares and will encompass the Jiaxing Train Station, the plazas to the north and south, and a renovation of the adjacent People’s Park. The completed project will become a new green urban center for Jiaxing’s citizens and travelers.
MAD’s design includes a 1:1 rebuilding of the historic station building (destroyed in 1937) derived from archival studies, while creating a new train station underground. MAD engaged with scholars, consultants, and experts in heritage architecture to recover data to help aid the project. Upon completion, the rebuilt old station building will become the Jiaxing Railway History Museum.
The new station will be bright, efficient, and human-scaled. Natural light will create a friendly, comfortable environment. The main transportation and commercial functions will be located in the basement level, allowing for ground-floor space to be given back to nature.
The people’s Park will radiate through the scheme into the city and form an urban oasis. A careful consideration to landscape and massing has formed an axis with the reconstructed old station building at its core. In front of the station, a large collection of canopy shaped trees has been planted, creating comfortable, natural shades for the plaza. Upon completion the scheme will become a borderless park where citizens and travelers can dwell and enjoy the natural environment.
The rebuilt train station building and the ‘floating’ metal roof of the new station will blend with the forest trees. The station concourse, platforms, and waiting hall are hidden underground so the building’s single-story height above ground level respects the scale of the old station building. The underground areas will be flooded with natural light thanks to skylights and glass curtain walls on the ground floor
As people move from the waiting hall to the platforms via a futuristic underground tunnel they will be able to see the rebuilt old station building overhead creating a sharp contrast between the past and the future.
Sunken courtyards will connect the underground commercial space with the parkland above. On the roof of the new station, solar photovoltaic panels will enhance the project’s sustainability. To the south of the station a new above-ground commercial area will be enclosed by landscaped public lawns that can host a variety of events, festivals, concerts, or markets.
Bus terminals, a tramway, metro, car parking, and taxi stands are interconnected by the scheme, creating an efficient transportation portfolio accessed from the train station. In total, the capacity of the train station will be upgraded to three platforms serving six tracks, as opposed to the previous three platforms serving five tracks. The overall passenger capacity is expected to reach 5.28 million people per year, with peak-time capacity reaching 2,300 people per hour.
Train Station in the Forest is slated for completion by July 1, 2021.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard