At Charlotte Pipe and Foundry, we know that the first item on everybody's Value Engineering (VE) checklist is Cast Iron Soil Pipe (CISP) to PVC for drain, waste and vent applications. We make both plumbing systems, and believe that the right material should be used for every application. But, under financial pressure, things can get tricky in the VE process. That's what happened with one of the largest building projects in recent NCAA history, the Boone Pickens Stadium at Oklahoma State University (OSU).
In 2011, two years after it opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed fifteen other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered through finished concrete floors to fix the problems.
Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The water heater manufacturer agreed to pay $125,000 of the settlement. Properly functioning temperature and pressure relief valves, which are standard on all water heaters or boilers, will discharge water up to 200 degrees Fahrenheit — 60 degrees higher than the 140 degree limit on PVC. Sadly, avoidable mistakes like these are more common than they should be.
PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Also, PVC has specific temperature and hanger spacing requirements. In addition, it requires extra care and attention in plenum spaces and in fire wall penetrations.
To make sure that the particulars and intricacies of this choice aren't confusing, we have prepared a downloadable brochure and handy checklist. The brochure covers the benefits of both systems, and the checklist is a simple yes/no form to help you understand the full ramifications of a PVC versus CISP VE decision.
Download the brochure, checklist and more VE resources at charlottepipe.com/VE.
What happened at OSU was an avoidable tragedy. With a proper and thorough understanding of the strengths and weaknesses of PVC and CISP for your plumbing application, you can greatly reduce the chance of anything like this happening to you.
*Please note: Information for this case study was found in published media reports and public records.
Related Stories
| Aug 11, 2010
AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report
A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
HNTB, Arup, Walter P Moore among SMPS National Marketing Communications Awards winners
The Society for Marketing Professional Services (SMPS) is pleased to announce the 2009 recipients of the 32nd Annual National Marketing Communications Awards (MCA). This annual competition is the longest-standing, most prestigious awards program recognizing excellence in marketing and communications by professional services firms in the design and building industry.
| Aug 11, 2010
New book provides energy efficiency guidance for hotels
Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging. The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.
| Aug 11, 2010
Perkins+Will master plans Vedanta University teaching hospital in India
Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.
| Aug 11, 2010
Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms
A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report
A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
High-profit design firms invest in in-house training
Forty-three percent of high-profit architecture, engineering, and environmental consulting firms have in-house training staff, according to a study by ZweigWhite. The 2008-2009 Successful Firm Survey reports that only 36% of firms overall have in-house training staff. In addition, 52% of high-profit firms use an online training system or service.