At Charlotte Pipe and Foundry, we know that the first item on everybody's Value Engineering (VE) checklist is Cast Iron Soil Pipe (CISP) to PVC for drain, waste and vent applications. We make both plumbing systems, and believe that the right material should be used for every application. But, under financial pressure, things can get tricky in the VE process. That's what happened with one of the largest building projects in recent NCAA history, the Boone Pickens Stadium at Oklahoma State University (OSU).
In 2011, two years after it opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed fifteen other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered through finished concrete floors to fix the problems.
Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The water heater manufacturer agreed to pay $125,000 of the settlement. Properly functioning temperature and pressure relief valves, which are standard on all water heaters or boilers, will discharge water up to 200 degrees Fahrenheit — 60 degrees higher than the 140 degree limit on PVC. Sadly, avoidable mistakes like these are more common than they should be.
PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Also, PVC has specific temperature and hanger spacing requirements. In addition, it requires extra care and attention in plenum spaces and in fire wall penetrations.
To make sure that the particulars and intricacies of this choice aren't confusing, we have prepared a downloadable brochure and handy checklist. The brochure covers the benefits of both systems, and the checklist is a simple yes/no form to help you understand the full ramifications of a PVC versus CISP VE decision.
Download the brochure, checklist and more VE resources at charlottepipe.com/VE.
What happened at OSU was an avoidable tragedy. With a proper and thorough understanding of the strengths and weaknesses of PVC and CISP for your plumbing application, you can greatly reduce the chance of anything like this happening to you.
*Please note: Information for this case study was found in published media reports and public records.
Related Stories
Sponsored | Plumbing | Nov 10, 2017
Big ideas in a small space
Tiny house with Viega products finished second in a tiny house competition in California.
Sponsored | Plumbing | Aug 4, 2017
Shower threshold height – a better shower from the ground up!
Getting the right threshold height for your code-compliant shower installation is critical. In this blog post, we will consider how shower and shower-pan threshold heights work and why they are important for successfully meeting accessibility code requirements.
Sponsored | Plumbing | Aug 2, 2017
The new commercial restroom relies on durability and style
Architects and designers should look for well-designed products that can stand up to the daily demands of such frequented spaces.
Sponsored | HVAC | Apr 6, 2017
Viega ProPress shines in SolarCity construction
Buffalo will be the first city to produce the first-ever true solar roof – a roofing product with solar panels built in.
Architects | Apr 4, 2017
Architect Howard Elkus dies at 78
Cofounder of Elkus Manfredi Architects, his career spanned five decades, and included a spectrum of major design projects.
Sponsored | Plumbing | Feb 22, 2017
Press pipe-joining provides valuable savings on potable water installation at Mercy Health – West Hospital
Nelson Stark selected Viega ProPress for the plumbing installation because the system is flameless and can be installed simultaneously with other utilities since there’s no need for welding or grooving equipment.
Sponsored | Plumbing | Jul 19, 2016
Getting out of the 1960s: New thinking needed for Locker Room Showers