At Charlotte Pipe and Foundry, we know that the first item on everybody's Value Engineering (VE) checklist is Cast Iron Soil Pipe (CISP) to PVC for drain, waste and vent applications. We make both plumbing systems, and believe that the right material should be used for every application. But, under financial pressure, things can get tricky in the VE process. That's what happened with one of the largest building projects in recent NCAA history, the Boone Pickens Stadium at Oklahoma State University (OSU).
In 2011, two years after it opened, a break in a plastic drain pipe was found. An inspection of the rest of the system revealed fifteen other breaks. The football team was forced to abandon the facility for five months while contractors jackhammered through finished concrete floors to fix the problems.
Litigation was eventually settled in February 2015, for $700,000. The biggest portion of the settlement ($400,000) was paid by the firm that did the architectural, engineering and design work. The water heater manufacturer agreed to pay $125,000 of the settlement. Properly functioning temperature and pressure relief valves, which are standard on all water heaters or boilers, will discharge water up to 200 degrees Fahrenheit — 60 degrees higher than the 140 degree limit on PVC. Sadly, avoidable mistakes like these are more common than they should be.
PVC can be used successfully below ground, but it requires careful installation and soil prep per ASTM D2321. Also, PVC has specific temperature and hanger spacing requirements. In addition, it requires extra care and attention in plenum spaces and in fire wall penetrations.
To make sure that the particulars and intricacies of this choice aren't confusing, we have prepared a downloadable brochure and handy checklist. The brochure covers the benefits of both systems, and the checklist is a simple yes/no form to help you understand the full ramifications of a PVC versus CISP VE decision.
Download the brochure, checklist and more VE resources at charlottepipe.com/VE.
What happened at OSU was an avoidable tragedy. With a proper and thorough understanding of the strengths and weaknesses of PVC and CISP for your plumbing application, you can greatly reduce the chance of anything like this happening to you.
*Please note: Information for this case study was found in published media reports and public records.
Related Stories
Sponsored | | Oct 13, 2014
Liberty Utilities protects installers with Viega MegaPress
Liberty Utilities of New Hampshire wanted a way to keep its installers safe without compromising the quality of their installations, which is why the utility provider decided to start installing Viega MegaPress. SPONSORED CONTENT
Sponsored | | Sep 13, 2014
Right Way Plumbing finishes first at Max Planck Florida Institute
The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.
Sponsored | | Jun 22, 2014
JW Marriott Indianapolis redefines city’s skyline
The 34-story JW Marriott is both the largest and tallest hotel in Indianapolis. One of the most prestigious hotels in the city, the JW Marriott has hosted celebrities and NFL teams alike.
| May 1, 2014
Tight on space for multifamily? Check out this modular kitchen tower
The Clei Ecooking kitchen, recently rolled out at Milan's Salone de Mobile furniture fair, squeezes multiple appliances into a tiny footprint.
| Feb 27, 2014
Transition Fittings from Viega Make Press Connections Between Copper and PEX Systems
Viega offers the only press fitting to transition from copper to PEX tubing, eliminating the need for solder or threaded adapters.
| Jan 8, 2014
United Association, NRDC seek major plumbing code changes
Proposed changes include mandating the insulation of hot water piping in new buildings.
| Nov 25, 2013
Building Teams need to help owners avoid 'operational stray'
"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.
| Oct 27, 2013
Uponorpro.com now features LiveChat online technical support for professionals
Free service provides professionals in the PEX plumbing, fire sprinkler, and radiant heating and cooling industries access to Uponor Technical and Design Services online for support.
| Sep 27, 2013
ASHRAE/IES publish first standard focused on commissioning process
ANSI/ASHRAE/IES Standard 202, Commissioning Process for Buildings and Systems, identifies the minimum acceptable commissioning process for buildings and systems as described in ASHRAE’s Guideline 0-2005, The Commissioning Process. Standard 202 is ASHRAE’s first standard focused on the commissioning process.
| May 9, 2013
10 high-efficiency plumbing fixtures
From a "no sweat" toilet to a deep-well lavatory, here's a round up of the latest high-efficiency plumbing fixtures.