Purpose built shipping containers are being used in the construction of a modular 220-room Holiday Inn Express in Trafford City, Manchester, UK.
The shipping containers come with fully factory finished interior fixtures and fittings that are installed before being delivered to the site. Additionally, the rooms have full height windows and are fully furnished before leaving the factory.
In order to make the off-site modular design the hotel uses work, Chapman Taylor, the architect for the project, developed a fully coordinated BIM model to inform the detailed design and enable the off-site works to commence. Chapman Taylor and Bowmer & Kirkland, the contractor, hope to deliver the project in less than 12 months.
Rendering courtesy of Chapman Taylor.
Construction of the ground floor and podium structure is underway on site while, simultaneously, the bedroom modules are being manufactured off-site. Once delivered, the modules will be stacked on top of the podium structure. Each of the 220 guest room modules will be installed within a two to four week period.
One module comprises two fully furnished en-suite rooms that are separated by a section of circulation corridor. Once the modules are in place on site, the external envelope, which consists of prefinished rainscreen cladding and single ply roofing systems, is applied.
The project is a joint venture between Mill Lane Estates, Topland Group, and Marick.
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| May 22, 2012
Batson-Cook names Partin VP of Business Development
Partin joins general contractor from Georgia Hospital Association.
| May 16, 2012
AEG releases 3D video of L.A.'s Farmers Field
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.