An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.
The project integrates over an acre of landscaped space, embodying biophilic design principles that connect indoor and outdoor environments. With abundant natural light, lush greenery, and outdoor gathering areas, the design promotes wellness and a sustainable work-life balance.
Amenities include one acre of accessible landscaped space, floor-to-ceiling windows for natural light, covered parking in an open-air garage, valet services, and bike storage, encouraging workers to return to the office with an experience promoting social interaction and wellbeing. The site leaves 45% of its area open to the sky with 12,000 sf of intensive landscaping integrating 33 fully grown mature trees into a family of interlocking courtyards and paseos that meander around the buildings.
The campus is designed with the flexibility to accommodate single or multiple tenants, with adjacent expansion opportunities via other assets in the neighborhood. The buildings were designed with a hybrid structural system consisting of cross-laminated timbers (CLTs), steel, and concrete to reduce the overall carbon impact and weight.
The goal of the development is to serve the neighborhood with creative office space, a cafe with parking provided at grade and in structures, and generous bicycle amenity space. Tenants and workers can enjoy new amenities like pocket parks and outdoor gathering spaces. The project anticipates future trends, such as autonomous driving, and considers them in its long-term strategy. If demand for parking decreases, parking areas can be converted to retail, commercial, light manufacturing, or housing uses.
The project is set to open in September 2024.
Owner and/or developer: The Bradmore Group, in collaboration with Lincoln Property Company
Design architect: RIOS
Architect of record: House & Robertson Architects
MEP engineer: ARC Engineering
Structural engineer: Holmes US
General contractor: Morley Builders
Construction manager: Lincoln Property Company
Related Stories
Mass Timber | May 8, 2024
Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units
An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city.
Mass Timber | Apr 25, 2024
Bjarke Ingels Group designs a mass timber cube structure for the University of Kansas
Bjarke Ingels Group (BIG) and executive architect BNIM have unveiled their design for a new mass timber cube structure called the Makers’ KUbe for the University of Kansas School of Architecture & Design. A six-story, 50,000-sf building for learning and collaboration, the light-filled KUbe will house studio and teaching space, 3D-printing and robotic labs, and a ground-level cafe, all organized around a central core.
Libraries | Apr 24, 2024
New mass timber Teddy Roosevelt library aims to be one with nature
On July 4, 2026, the Theodore Roosevelt Presidential Library is scheduled to open on 93 acres in Medora, a town in North Dakota with under 130 permanent residents, but which nonetheless has become synonymous with the 26th President of the United States, who lived there for several years in the 1880s.
Mass Timber | Apr 22, 2024
British Columbia changing building code to allow mass timber structures of up to 18 stories
The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit.
Mass Timber | Mar 17, 2024
Timberlab to build its first mass timber manufacturing plant
The facility anticipates continued demand growth.
Mass Timber | Feb 21, 2024
The future of mass timber construction will depend on codes, costs, and climate change
Hines and DLR Group are moving forward on multiple projects using engineered wood.
Mass Timber | Feb 15, 2024
5 things developers should know about mass timber
Gensler's Erik Barth, architect and regional design resilience leader, shares considerations for developers when looking at mass timber solutions.
Mass Timber | Jan 2, 2024
5 ways mass timber will reshape the design of life sciences facilities
Here are five reasons why it has become increasingly evident that mass timber is ready to shape the future of laboratory spaces.
Airports | Dec 4, 2023
4 key innovations and construction trends across airport design
Here are some of the key trends Skanska is seeing in the aviation sector, from congestion solutions to sustainability.
Mass Timber | Oct 27, 2023
Five winners selected for $2 million Mass Timber Competition
Five winners were selected to share a $2 million prize in the 2023 Mass Timber Competition: Building to Net-Zero Carbon. The competition was co-sponsored by the Softwood Lumber Board and USDA Forest Service (USDA) with the intent “to demonstrate mass timber’s applications in architectural design and highlight its significant role in reducing the carbon footprint of the built environment.”