flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A massive redevelopment in Tokyo reunites developer and architect

High-rise Construction

A massive redevelopment in Tokyo reunites developer and architect

Mitsui Fudosan and SOM join forces to create OH-1, a mixed-use complex with a prominent public square.


By John Caulfield, Senior Editor | September 23, 2016

The OH-1 redevelopment project in Tokyo, one of that metro's biggest projects, is designed to recall the past and look forward to the future. Image: courtesy SOM / © Methanoia

One of the largest redevelopments in Tokyo’s history is underway.

The project, known as OH-1 (it is located in Tokyo’s Ohtemachi business district), will consist of two high-rise buildings with 360,000 sm (3.88 million sf) of total floor space, and a landscaped public open space. The redevelopment, which covers 20,900 sm, will be adjacent to the Imperial Palace East Gardens.

OH-1’s mixed-use programming includes office space, a luxury hotel, retail, and cultural facilities. It is scheduled for completion in 2020.

The project, whose construction began on May 18, was initiated by the developer Mitsui Fudosan, and will provide a new corporate headquarters for Mitsui & Co., one of Japan’s largest trading companies. The developer and the project’s design architect, Skidmore, Owings & Merrill (SOM), have worked together before on big projects, including the 2.6-hectare (280,000-sf) Nihonbashi 2 Chrome Redevelopment, which also includes two office towers with combined floor space of 201,456 sm, and is scheduled for completion in 2018.

SOM’s design for OH-1, says the company, sets out to balance tradition and innovation. The 160-meter-tall, 31-story Tower A, which faces the Imperial Palace, is the lower of the two high rises, and harmonizes with surrounding buildings. The use of glass and granite cladding is “inspired” by traditional Japanese woodworking techniques.

Tower B, at 39 stories (five below ground) and 200 meters tall, is clad in glass and steel, a nod to the contemporary Japan and the Tokyo skyline in which this building will be embedded.

Both towers will facilitate natural ventilation and strive toward energy efficiency.

“Our design bridges Tokyo’s past and future—honoring the historical and cultural significance of its site, and … signaling Japan’s status at the forefront of technology and innovation,” said Mustafa Abadan, SOM’s Design Partner, in a prepared statement.

 

OH-1's two towers differ in their scale, massing, and materiality. Image: courtesy SOM / © Methanoia

 

The 6,000-sm public space, which will be constructed on the western edge of the site after the buildings are completed, will be landscaped with native trees, and include a reflecting pool and a plaza for outdoor events, as well as a multipurpose hall overlooking the park and plaza.

The park’s design preserves and enhances the setting of the historic cultural monument Masakado’s Shrine, honoring the 10th-century samurai Taira no Masakado, who led a rebellion against Kyoto’s central government. The park also will have direct access to Tokyo’s public transit system.   

According to Mitsui, OH-1’s design is being supervised by a joint venture of Nikken Sekkei Ltd. and Kajima Corporation. The project’s GC is Kajima Corporation. 

Related Stories

High-rise Construction | Jun 28, 2016

CTBUH names winners and finalists for 2016 Tall Building Awards

Eight winners were named in five categories that recognized tall buildings, urban habitats, innovation, performance, and decade-long excellence.

High-rise Construction | Jun 15, 2016

WilkinsonEyre designs diamond-patterned Bay Park Centre for Toronto

A sloping plaza with trees, grass, and gardens connects the two downtown towers.

Sponsored | High-rise Construction | Jun 13, 2016

Marilyn Monroe’ tower adds curves to the Toronto skyline

Made of glass, concrete, and steel, the 56-story tower has been dubbed the "Marilyn Monroe" because of its curving lines.

High-rise Construction | Jun 7, 2016

Gensler’s Gateway Tower picks up where Calatrava's Chicago Spire left off

A new 2,000-foot tower has been proposed for a site that is currently a non-monument to an abandoned plan.

Codes and Standards | May 25, 2016

LEED Dynamic is worth the effort, says commercial real estate executive

San Diego office tower is California’s first office building to receive LEED Dynamic plaque in recertification.  

Building Team Awards | May 20, 2016

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.

High-rise Construction | May 17, 2016

Foster + Partners-designed towers approved as part of massive neighborhood redevelopment in San Francisco

One of Oceanwide Center’s buildings will be the city’s second tallest. 

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

High-rise Construction | May 2, 2016

UPDATED* Construction to begin this summer in Chicago on Studio Gang’s Vista Tower

The 1,186-foot tower will be the third-tallest building in the city.  

Wood | Apr 29, 2016

Anders Berensson Architects designs 40-story wooden skyscraper for Stockholm

The structure, which will be made entirely out of cross-laminated timber, will rise 436 feet into the air, making it Stockholm’s tallest building.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021