Sometimes it can be tricky to expand your place of business and stay in business at the same time. It helps to have a little extra land, and to choose a fast, efficient metal building system from Star Buildings.
The Norris car dealership is a family-owned business with a nearly half-century tradition serving the city of Titusville, FL. It’s a city that has bounced back from the brink. The local workforce was deeply involved in NASA’s Space Shuttle program, and the city was hard-hit economically when the program ended in 2011, in addition to suffering from the overall economic recession. But things are getting better, and the Norris family thought it was time to re-invest in Titusville.
“Part of the advantage of a family business is that we’re focused on 30 years down the road. That’s part of the reason I wanted to build these buildings,” explains third-generation owner Josh Norris. “This was a ground-up renovation that we thought was important for the future of our three-generation family business. We’re looking forward to 30 or 40 more years of having a facility to serve our community, and how could you predict that times will ever be better to build than right now? Interest rates are low, the economy is going up, and signs are that it will keep going up. It just makes sense.”
Their dealership is a type that is not uncommon in smaller markets: it’s two dealerships – Honda and Buick/GMC in this case – that were sharing a single lot and a service center. The triangular, 6-acre parcel of land actually included multiple buildings, several smaller concrete block structures, and a large metal building that housed the combined showroom. Seventeen service bays were spread out in different structures.
Norris decided to build two metal buildings on the grounds, on the advice of general contractor Rush Construction, and the job went to Star Buildings’ builder, Allegiance Contracting, Inc., located in nearby Melbourne, FL.
Allegiance owner, Jane Lindsey, describes it as a very exciting project for her, because she was directly involved with the architects and the general contractor from the design stage onward.
Lindsey’s involvement was key to getting the project built correctly. “There were issues they were trying to deal with that would be important during construction that I could assist with,” said Lindsey. For example, the large expanse of glass across the front restricted the depth of the steel columns, which put more steel overhead.
The two buildings, with a combined footprint of almost 35,000 sf, were built largely simultaneously. The plan was to build the smaller structure, move Buick/GMC operations into it, and continue to sell Honda out of the old building while the new Honda dealership was under construction.
Lindsey realized she could gain efficiency by overlapping the construction schedules. “If one job was waiting for something, we could jump over and work on the other building,” she said. The Buick/GMC building was started first, and took 12 weeks to build. The Honda building began soon afterwards, and took 16 weeks.
Despite the fact that each building had a different architect, “with Rush Construction, I was under one contract for both buildings,” explains Lindsey.
She was onsite every day there was activity with the metal building systems.
Being able to alternate work between the two buildings gave Lindsey flexibility to pick up the slack during delays, and to handle the formidable task of coordinating the various construction entities on the job.
“There was a lot of coordination with other trades,” recalls Lindsey. “For example, we had to work closely with the mechanical contractor because of where his curbs would be located, and the bracing for the curbs. The Honda building has 11 different RTU’s (roof top units), and the Buick building has nine. We had a number of meetings on site with him to make sure that when he ran his ductwork, the bracing for the units was exactly where it needed to be.”
The two buildings were architecturally distinct projects, both benefitting from Star Building’s compatibility with a wide range of architectural styles. Norris was able to upgrade their business for a much more modern look to match their improved operational abilities. The Honda dealership features the Honda Generation III design, and the Buick/GMC dealership sports Buick’s latest design image package.
The rears of the buildings, where the service areas are located, feature PBR panel walls. The roof is a Double-Lock standing seam roofing system.
“One of the reasons I was awarded the project,” states Lindsey, “is that I was able to offer the owner the twenty-year, single source, no dollar limit weather tightness warranty. The roof system, the HVAC curbs, it was all single source; they all came through NCI, parent company of Star Buildings. They warranty the roof system to be weather tight.
“Our old metal building lasted us almost 50 years,” reflects Josh Norris. “But now we have much more modern high ceilings. In the old one, we had a trailer enclosed in the building as our office. The new Buick store has an air-conditioned second floor for IT, records, and office space. Honda has a second floor for parts storage.”
Norris has also noticed the increased energy efficiency of his new dealerships. “I’ve been very impressed with our utility bills, they’ve gone down significantly. We have a 50,000-sf store across town. The new stores’ utility bills typically run about half of the one across town.”
The new dealerships have made a difference to the community as a whole. “There were articles in the local paper about how good the projects were for the community,” recalls Lindsey. “It’s put new life into the city of Titusville.”
“In Titusville, we’re slow to spend money if you don’t have to. But right now, we are definitely enjoying the benefits of our area. It’s growing. Now was the time to make this change,” concurs Josh Norris about the effect of the project. “The community has definitely shown appreciation for our development downtown. One of the first customers we had was the mayor, who was appreciative of our helping develop the downtown area.”
Ron Norris Honda:
Erector: Pre-Engineered Steel, Inc
Architect: Craig Suman
Structural Engineer: CEG Structural, Tom Adams
Ron Norris Buick-GMC:
Erector: Pre-Engineered Steel, Inc
Architect: Michael A. Penny
Structural Engineer: CEG Structural, Tom Adams
Related Stories
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Reflecting on job number 61-001
Job number 61-001 changed everything. It was sold in 1961, a year of change for the nation and for Star. By January, John F. Kennedy would be president. By the end of the year, Star would launch a historic shift in our product and our distribution, a shift still active today.
| Mar 31, 2014
Tips for creating a competitive bid using codes and loads
Landing a project feels like winning a prize, sort of like finding that forgotten $20 bill in the pocket of a pair of jeans you haven’t worn in a while. But living on the “chance” of winning a job isn’t a great way to pay your electric bill. So, how do you swing the chances in your favor?
| Mar 26, 2014
A sales and service showcase
High Plains Equipment, a Case IH dealership in Devils Lake, N.D., constructs a larger facility to better serve its customers.
| Mar 19, 2014
Frames: the biggest value engineering tip
In every aspect of a metal building, you can tweak the cost by adjusting the finish, panel thickness, and panel profile. These changes might make a few percentage points difference in the cost. Change the framing and you have the opportunity to affect 10-20 percent savings to the metal building portion of the project.
| Mar 11, 2014
Why you should start with a builder, part three
We had worked together for 30 years. As a long-standing client of mine, he and I had gone through many projects together. And we were approaching another project, one that would forever change how he viewed our working relationship. As my customer and I sat down to talk about the project details, he told me something that would stay with me for weeks. “Kim, I’m going to have to get other bids on this just so I have peace of mind.”
Sponsored | | Mar 10, 2014
A high-performance barn
Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.
| Mar 4, 2014
CENTRIA Demonstrates Commitment to Contractors
New Brochure Highlights Architectural Metal Panel Manufacturer’s Products, Expertise and Experience
| Feb 27, 2014
Colorado Coalition Plans Welcoming Events for METALCON International Visitors
Visitors to the 24th METALCON International, slated for October 1-3 at the Colorado Convention Center in Denver, will get a royal welcome from local companies involved in the show. Denver-based New Tech Machinery and Colorado Springs-based S-5! Solutions have formed the Colorado Coalition as a way of encouraging visitors to learn about Colorado before they arrive and for Coloradans to experience METALCON.
| Feb 27, 2014
Metal Construction Association introduces two Environmental Product Declarations
Two Environmental Product Declarations (EPD), one for Metal Composite Material Panels and one for Roll Formed Steel Panels for Roofs and Walls, are now available free of charge from the Metal Construction Association (MCA) on its website.