Metal Building Helps Family Business

Sponsored Content Metals

Metal Building Helps Family Business

The two buildings were architecturally distinct projects, both benefiting from Star Building’s compatibility with a wide range of architectural styles


By Star Building Systems | August 7, 2015
Metal Buildings, Buick/GMC dealership

The Buick/GMC building was started first, and took 12 weeks to build.

Sometimes it can be tricky to expand your place of business and stay in business at the same time. It helps to have a little extra land, and to choose a fast, efficient metal building system from Star Buildings.

The Norris car dealership is a family-owned business with a nearly half-century tradition serving the city of Titusville, FL. It’s a city that has bounced back from the brink. The local workforce was deeply involved in NASA’s Space Shuttle program, and the city was hard-hit economically when the program ended in 2011, in addition to suffering from the overall economic recession. But things are getting better, and the Norris family thought it was time to re-invest in Titusville.

“Part of the advantage of a family business is that we’re focused on 30 years down the road. That’s part of the reason I wanted to build these buildings,” explains third-generation owner Josh Norris. “This was a ground-up renovation that we thought was important for the future of our three-generation family business. We’re looking forward to 30 or 40 more years of having a facility to serve our community, and how could you predict that times will ever be better to build than right now? Interest rates are low, the economy is going up, and signs are that it will keep going up. It just makes sense.”

Their dealership is a type that is not uncommon in smaller markets: it’s two dealerships – Honda and Buick/GMC in this case – that were sharing a single lot and a service center. The triangular, 6-acre parcel of land actually included multiple buildings, several smaller concrete block structures, and a large metal building that housed the combined showroom. Seventeen service bays were spread out in different structures. 

Norris decided to build two metal buildings on the grounds, on the advice of general contractor Rush Construction, and the job went to Star Buildings’ builder, Allegiance Contracting, Inc., located in nearby Melbourne, FL. 

Allegiance owner, Jane Lindsey, describes it as a very exciting project for her, because she was directly involved with the architects and the general contractor from the design stage onward.

Lindsey’s involvement was key to getting the project built correctly. “There were issues they were trying to deal with that would be important during construction that I could assist with,” said Lindsey. For example, the large expanse of glass across the front restricted the depth of the steel columns, which put more steel overhead.

The two buildings, with a combined footprint of almost 35,000 sf, were built largely simultaneously. The plan was to build the smaller structure, move Buick/GMC operations into it, and continue to sell Honda out of the old building while the new Honda dealership was under construction. 

Lindsey realized she could gain efficiency by overlapping the construction schedules. “If one job was waiting for something, we could jump over and work on the other building,” she said. The Buick/GMC building was started first, and took 12 weeks to build.  The Honda building began soon afterwards, and took 16 weeks. 

Despite the fact that each building had a different architect, “with Rush Construction, I was under one contract for both buildings,” explains Lindsey. 

She was onsite every day there was activity with the metal building systems.

Being able to alternate work between the two buildings gave Lindsey flexibility to pick up the slack during delays, and to handle the formidable task of coordinating the various construction entities on the job.

“There was a lot of coordination with other trades,” recalls Lindsey. “For example, we had to work closely with the mechanical contractor because of where his curbs would be located, and the bracing for the curbs. The Honda building has 11 different RTU’s (roof top units), and the Buick building has nine. We had a number of meetings on site with him to make sure that when he ran his ductwork, the bracing for the units was exactly where it needed to be.” 

The two buildings were architecturally distinct projects, both benefitting from Star Building’s compatibility with a wide range of architectural styles. Norris was able to upgrade their business for a much more modern look to match their improved operational abilities. The Honda dealership features the Honda Generation III design, and the Buick/GMC dealership sports Buick’s latest design image package.

The rears of the buildings, where the service areas are located, feature PBR panel walls. The roof is a Double-Lock standing seam roofing system.

“One of the reasons I was awarded the project,” states Lindsey, “is that I was able to offer the owner the twenty-year, single source, no dollar limit weather tightness warranty. The roof system, the HVAC curbs, it was all single source; they all came through NCI, parent company of Star Buildings. They warranty the roof system to be weather tight.

“Our old metal building lasted us almost 50 years,” reflects Josh Norris. “But now we have much more modern high ceilings. In the old one, we had a trailer enclosed in the building as our office. The new Buick store has an air-conditioned second floor for IT, records, and office space. Honda has a second floor for parts storage.”

Norris has also noticed the increased energy efficiency of his new dealerships. “I’ve been very impressed with our utility bills, they’ve gone down significantly. We have a 50,000-sf store across town. The new stores’ utility bills typically run about half of the one across town.”

The new dealerships have made a difference to the community as a whole. “There were articles in the local paper about how good the projects were for the community,” recalls Lindsey. “It’s put new life into the city of Titusville.”

 “In Titusville, we’re slow to spend money if you don’t have to. But right now, we are definitely enjoying the benefits of our area. It’s growing. Now was the time to make this change,” concurs Josh Norris about the effect of the project. “The community has definitely shown appreciation for our development downtown. One of the first customers we had was the mayor, who was appreciative of our helping develop the downtown area.”

Ron Norris Honda:
Erector: Pre-Engineered Steel, Inc
Architect: Craig Suman
Structural Engineer: CEG Structural, Tom Adams

Ron Norris Buick-GMC:
Erector: Pre-Engineered Steel, Inc
Architect: Michael A. Penny
Structural Engineer: CEG Structural, Tom Adams

Tags

Related Stories

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

Sponsored | | Nov 20, 2013

Four faces of curb appeal

The Furniture Row retail center in Charlotte, N.C., incorporates four specialty stores in a distinctive, efficient structure. 

| Nov 18, 2013

The builder’s building

Versatility topped Ron Cleveland’s list of priorities when he and his wife decided to construct a new building in Beaumont, Texas, to accommodate the two businesses they jointly own. Cleveland also wanted to create a structure that would serve as an effective marketing tool for his construction firm. An 11,526-sf custom metal office building met both goals.

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Oct 30, 2013

Metal roof design tips: The devil is in the details

This AIA/CES-approved presentation provides information regarding proper design to prevent possible infiltration from the roof system into the building. It also works as a guide when designing a roof to allow for proper water runoff.

| Oct 28, 2013

Metal roofs are topping more urban dwellings

Given their durability and ease of use, metal roofs have been a common feature on rural houses for decades. Now they’re becoming an increasingly popular choice on urban dwellings as well. 

| Oct 23, 2013

Some lesser-known benefits of metal buildings

While the durability of metal as a construction material is widely recognized, some of its other advantages are less commonly acknowledged and appreciated.  

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

Building Enclosure Systems | Mar 13, 2013

5 novel architectural applications for metal mesh screen systems

From folding façades to colorful LED displays, these fantastical projects show off the architectural possibilities of wire mesh and perforated metal panel technology.

| Mar 6, 2013

Centria announces leadership changes

CENTRIA President Mark Sherwin has announced his retirement beginning April 1, 2013. Sherwin has served as president of CENTRIA, an industry leader in the design, development and manufacture of architectural metal wall and roof systems, for more than 17 years.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021