flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Metl-Span systems meet design needs in cost effective manner

Sponsored Content Walls and Partitions

Metl-Span systems meet design needs in cost effective manner

Western Nassau Water Authority features unique wall, window integration.


By Metl-Span | March 25, 2015
Metl-Span systems meet design needs in cost effective manner

One challenge required onsite bending of CFA panels for the curved portion of the facility. Photo courtesy of Metl-Span.

The combination of Metl-Span engineering and products met the challenging design demands of the new Western Nassau Water Authority administrative office building in North New Hyde Park, N.Y.

The goal from the beginning was to construct an energy efficient building with insulated metal panels and it had to be aesthetically pleasing, according to architect Charlie Lovell of Angelo Francis Corva & Associates in West Hempstead, N.Y. He was pleased with Metl-Span’s insulated metal panels.

“It’s a clean, aesthetic system and it holds the energy requirements of the building,” Lovell says. “It went together nicely.”

Approximately 7,500 square feet of Metl-Span panels, including insulated CFA and 7.2 Insul-Rib panels in Polar White, were installed by Girandola & Shutkind Construction of Bronx, N.Y. The CFA panels were insulated with a two-inch polyurethane foam core, the 7.2 Insul-Rib panels with 2-1/2 inches.

One challenge required onsite bending of CFA panels for the curved portion of the facility. The panels that required a 45-degree bend were factory notched and bent on site, while the panels with a 90-degree bend were bent in factory.

“We were relying on the shop drawings,” says Rich Shutkind of Girandola & Shutkind. “We spent a lot of time going over the drawings. Metl-Span’s engineering department was very helpful through the entire process. We were able to construct the circular dimensions they were looking for on the rounded part of the building. We bent the panels manually, in the field.”

The project also called for the horizontal installation of the 7.2 Insul-Rib panels up to 40 feet long, according to Shutkind. “That way we were able to avoid seams,” he said. “It’s a watertight system and it looks great.”

Metl-Span’s Metl-Vision Window System was designed to complement the architectural aesthetics and function of Metl-Span’s horizontal wall panels. According Shutkind, it easily integrated with the tongue and groove system of Metl-Span wall panels.

Metl-Span manufactures some of the most thermally efficient and cost-effective insulated metal wall, partition, ceiling and roof panels available today. The company is a recognized leader in the advancement of insulated panel technology and continues to shape industry standards. For more information on the complete line of Metl-Span products, call 877-585-9969 or visit www.metl-span.com.

Related Stories

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 4, 2012

Educational facilities see long-term benefits of fiber cement cladding

Illumination panels made for a trouble-free, quick installation at a cost-effective price.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021