The combination of Metl-Span engineering and products met the challenging design demands of the new Western Nassau Water Authority administrative office building in North New Hyde Park, N.Y.
The goal from the beginning was to construct an energy efficient building with insulated metal panels and it had to be aesthetically pleasing, according to architect Charlie Lovell of Angelo Francis Corva & Associates in West Hempstead, N.Y. He was pleased with Metl-Span’s insulated metal panels.
“It’s a clean, aesthetic system and it holds the energy requirements of the building,” Lovell says. “It went together nicely.”
Approximately 7,500 square feet of Metl-Span panels, including insulated CFA and 7.2 Insul-Rib panels in Polar White, were installed by Girandola & Shutkind Construction of Bronx, N.Y. The CFA panels were insulated with a two-inch polyurethane foam core, the 7.2 Insul-Rib panels with 2-1/2 inches.
One challenge required onsite bending of CFA panels for the curved portion of the facility. The panels that required a 45-degree bend were factory notched and bent on site, while the panels with a 90-degree bend were bent in factory.
“We were relying on the shop drawings,” says Rich Shutkind of Girandola & Shutkind. “We spent a lot of time going over the drawings. Metl-Span’s engineering department was very helpful through the entire process. We were able to construct the circular dimensions they were looking for on the rounded part of the building. We bent the panels manually, in the field.”
The project also called for the horizontal installation of the 7.2 Insul-Rib panels up to 40 feet long, according to Shutkind. “That way we were able to avoid seams,” he said. “It’s a watertight system and it looks great.”
Metl-Span’s Metl-Vision Window System was designed to complement the architectural aesthetics and function of Metl-Span’s horizontal wall panels. According Shutkind, it easily integrated with the tongue and groove system of Metl-Span wall panels.
Metl-Span manufactures some of the most thermally efficient and cost-effective insulated metal wall, partition, ceiling and roof panels available today. The company is a recognized leader in the advancement of insulated panel technology and continues to shape industry standards. For more information on the complete line of Metl-Span products, call 877-585-9969 or visit www.metl-span.com.
Related Stories
| Nov 2, 2010
11 Tips for Breathing New Life into Old Office Spaces
A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 12, 2010
Holton Career and Resource Center, Durham, N.C.
27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.
| Oct 12, 2010
Guardian Building, Detroit, Mich.
27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.
| Oct 12, 2010
Owen Hall, Michigan State University, East Lansing, Mich.
27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.
| Sep 13, 2010
Second Time Around
A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.
| Aug 11, 2010
Using physical mockups to identify curtain wall design flaws
Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.