Construction of Chicago’s new Metra Union Pacific/West commuter railroad station in Lombard, Ill., marks a major improvement for riders as well as the residents of the Village of Lombard. Prior to building the sparkling new station, riders simply boarded from two uncovered platforms. Now, the nearly 1,300 weekday riders enjoy the convenience and shelter of 250 linear feet of curved metal roof canopies on either side of the tracks.
The railroad line separates the Village of Lombard from north to south. A major component of the project included construction of a pedestrian tunnel to allow safe passage across the tracks.
The platform canopies are clad with approximately 11,000 sq. ft. of PAC-CLAD Tite-Loc Panels from Petersen. The curved 22-gauge panels are finished in Aged Copper. The Tite-Loc Panels were manufactured at Petersen’s headquarters plant in Elk Grove Village, Ill.
Design for the project was created by KMI Architects Engineers in Chicago. “The entire station was designed for economy and low maintenance,” explained John Mehdi, project designer at KMI. “The PAC-CLAD panels were selected for their durability. The overall canopy is long and we wanted to break it down into modules with the higher roofs marking the entrance to the platform area.” The repetitive modular sections reduce cost and can facilitate a future curtain wall system to further protect stairways and ramps from the elements.
Metra Union Pacific/West commuter railroad station in Lombard, Ill.
Installation of Petersen’s PAC-CLAD panels was completed by Progressive Dynamics in Streamwood, Ill., which is a regular user of various Petersen profiles. “The Tite-Loc Panels were a good fit for this job,” said Rodger Leonard, project manager. “The durability provided by a mechanically seamed profile was important. It was a relatively straight-forward job and turned out great. The greatest challenge definitely was working around the train schedule.”
Riders and residents alike have applauded the new station. Metra Executive Director/CEO Don Orseno said, “We have not only significantly boosted the appeal of the Lombard Station, but we have also significantly boosted safety. We now have fully renovated platforms with beautiful new canopies as well as a sparkling new pedestrian tunnel—the safest way possible to get across a set of train tracks.”
The general contractor on the project was John Burns Construction Co. in Orland Park, Ill.
Petersen manufactures PAC-CLAD metal cladding products in multiple gauges of steel and aluminum. PAC-CLAD products include standing-seam roof panels, hidden- and exposed-fastener wall panels, flush panels, soffit panels, perforated metal, fascia and coping systems, composite panels, column covers, coil and flat sheet. All are available in full 70% PVDF finish (Kynar) in 45 standard colors that include a 30-year finish warranty. Most colors meet LEED, Energy Star and Cool Roof Rating Council certification requirements. Founded in 1965, Petersen’s facilities are located in Illinois, Georgia, Texas, Maryland, Minnesota and Arizona.
For information on the complete line of Petersen metal products call 800-PAC-CLAD, visit pac-clad.com or write to info@pac-clad.com.
Related Stories
Sponsored | | Sep 30, 2014
How project managers can manage technology
Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT
| Sep 24, 2014
5 business lessons from a 43-year Star veteran
Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT
| Jul 21, 2014
16 utility questions to answer during your building project
We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT
Sponsored | | Jul 17, 2014
A major hop forward
The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.
| Jul 17, 2014
22 land questions to decide if your build site works
When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT
| Jul 9, 2014
The one misstep that could be slowing your company’s growth
Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT
| May 27, 2014
Contractors survey reveals improving construction market
The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT
| May 11, 2014
8 starter questions to answer when thinking about building
So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 17, 2014
6 details that can throw off your schedule
In 1997, Apple told us to “Think Different.” So we did. We thought about what could happen if the world went mobile, if information was boundless, if we could carry our office in our back pocket. We’ve grown to love different and to expect change. And when it comes to Apple products, that’s not such a bad thing. When it comes to your building order, however, it’s not nearly as appealing.