flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

High-rise Construction

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.


By BD+C Staff | March 16, 2015
Mexican Museum tower caught in turmoil to break ground this summer

Millennium Partners said it will break ground on the Mexican Museum this summer. Renderings courtesy Handel Architects

After several lawsuits and appeals to stop the 53-story Mexican Museum tower (also known as 706 Mission) from being built, the project will finally break ground this summer in San Francisco, according to Curbed San Francisco.

Designed by Handel Architects for developer Millennium Partners, the tower will house 190 luxury condo units, with the Mexican Museum in levels one through four. According to CurbedSF, the condos will be spacious by San Francisco standards: three- and four-bedroom units averaging 2,700 sf.

The museum will occupy the lower levels of both the new tower and the 1903 Aronson building next door, which is being restored as part of the project. The 10-story Aronson building will house space for the museum on levels two through four, with 16 residential units on floors above.

The project's biggest opponents are residents of the Four Seasons tower, a 430-foot-tall building in the Yerba Buena district. Their reasoning for arguing against the structure: they want the museum tower to be shorter.

Millennium Partners said it will break ground on 706 Mission while the lawsuits go through appeals after being thrown out by the courts. It's scheduled to be completed in September 2018, with sales beginning in 2017.

 

Related Stories

High-rise Construction | Apr 22, 2015

Architects propose sustainable ‘vertical city’ in the Sahara

Designers aim to make the 1,476-foot tower sustainable, relying on rainwater collection, solar power, and geothermal energy.

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

High-rise Construction | Apr 6, 2015

Melbourne tower will light up depending on weather

The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology. 

Multifamily Housing | Mar 31, 2015

Plans for a new condo tower in New York create a ‘communal ecosystem’ for residents

The conceptual plans for a 700-foot-tall, 65-story condominium tower in New York City were unveiled in early March by its architect, Perkins+Will.

High-rise Construction | Mar 24, 2015

Timber high-rise residential complex will tower over Stockholm waterfront

The four towers, 20 stories each, will be made entirely out of Swedish pine, from frame to façade.

Healthcare Facilities | Mar 23, 2015

Can advanced elevator technology take vertical hospitals to the next level?

VOA's Douglas King recalls the Odyssey project and ponders vertical transportation in high-rise healthcare design.

High-rise Construction | Mar 16, 2015

NBBJ creates 'shadowless' skyscraper concept for proposed UK development

A team of architects from the London branch of NBBJ used computer algorithms to generate a dual-tower design that maximizes sunlight reflections to eliminate the buildings' shadows. 

Cultural Facilities | Mar 13, 2015

New Orleans observation tower to feature 320-foot double-helix gondola ride

Tricentennial Tower will take visitors on a 300-year journey through the city's history before landing them at the top for a 360-degree view of the Crescent City.

High-rise Construction | Mar 12, 2015

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021