flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

High-rise Construction

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.


By BD+C Staff | March 16, 2015
Mexican Museum tower caught in turmoil to break ground this summer

Millennium Partners said it will break ground on the Mexican Museum this summer. Renderings courtesy Handel Architects

After several lawsuits and appeals to stop the 53-story Mexican Museum tower (also known as 706 Mission) from being built, the project will finally break ground this summer in San Francisco, according to Curbed San Francisco.

Designed by Handel Architects for developer Millennium Partners, the tower will house 190 luxury condo units, with the Mexican Museum in levels one through four. According to CurbedSF, the condos will be spacious by San Francisco standards: three- and four-bedroom units averaging 2,700 sf.

The museum will occupy the lower levels of both the new tower and the 1903 Aronson building next door, which is being restored as part of the project. The 10-story Aronson building will house space for the museum on levels two through four, with 16 residential units on floors above.

The project's biggest opponents are residents of the Four Seasons tower, a 430-foot-tall building in the Yerba Buena district. Their reasoning for arguing against the structure: they want the museum tower to be shorter.

Millennium Partners said it will break ground on 706 Mission while the lawsuits go through appeals after being thrown out by the courts. It's scheduled to be completed in September 2018, with sales beginning in 2017.

 

Related Stories

High-rise Construction | Jun 1, 2018

CTBUH names 2018 Best Tall Building Worldwide, among nine other award winners

Oasia Downtown Hotel named “Best Tall Building Worldwide” for 2018.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

High-rise Construction | May 18, 2018

The 100 tallest buildings ever conventionally demolished

The list comes from a recent CTBUH study.

High-rise Construction | May 14, 2018

Register before it’s too late: 2018 Tall + Urban Innovation Conference

The conference explores and celebrates the very best in innovative tall buildings, urban spaces, building technologies, and construction practices from around the world. 

Multifamily Housing | Apr 24, 2018

Adrian Smith + Gordon Gill Architecture designs 47-story condo tower in Miami

The tower will be located in Miami’s South Brickell neighborhood.

High-rise Construction | Apr 17, 2018

Developers reveal plans for 1,422-foot-tall skyscraper in Chicago

The tower would be the second tallest in the city.

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021