flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space

Mixed-Use

Miami ‘innovation district’ will have 6.5 million sf of dense, walkable space

Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout.


By BD+C Staff | May 5, 2015
Miami ‘Innovation District’ will have 6.5 million-sf dense, walkable space

Designers say the tower is inspired by things associated with Miami: fashion, sculpture, and sailboats. Renderings courtesy SHoP Architects

Miami developer Michael Simkins wants to create a space that will attract great talent to the city’s up-and-coming tech scene by providing amenities that, as The Next Miami puts it, “surpasses anything that currently exists in Miami.”

Hence, the developer has proposed a new mixed-used district and commissioned SHoP Architects and West 8 to design an environment with infrastructure for future growth of creative technology industries. 

Designing a neighborhood from the ground-up, developers aim to create a dense, walkable district that fulfills what is lacking from Miami’s current auto-dependent layout. The district will spread over ten acres on four blocks, and will include:

  • 3,850,000 sf office space
  • 2,400,000 sf residential space
  • 250,000 sf retail
  • 2,500 parking spaces

Renderings released by the design firm feature the Miami Innovation Tower, which the developers described in a statement as “a civic-minded icon for the digital age,” with designed inspired by things associated with Miami—“contemporary sculpture and fashion to the taught, wing-like graphics covered sails of modern racing sailboats.”

The project’s approval is expected later this year.

 

Related Stories

Mixed-Use | May 23, 2017

45-story tower planned for Miami Worldcenter

Pickard Chilton Architects will design the 600,000-sf 110 10th Street.

Mixed-Use | May 17, 2017

The Lincoln Common development has begun construction in Chicago’s Lincoln Park

The mixed-use project will provide new apartments, condos, a senior living facility, and retail space.

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Mixed-Use | Apr 25, 2017

Dutch building incorporates 22 emojis into its façade

The emoji building is part of a larger mixed-use development built around a 150-year-old oak tree.

Mixed-Use | Apr 24, 2017

Take a look at Brooklyn’s Domino Sugar Refinery redevelopment

The master plan features market-rate and affordable housing, mixed-use space, and a waterfront park with a 5-block long “Artifact Walk.”

Sports and Recreational Facilities | Apr 21, 2017

Boston Celtics training and practice facility will be part of Boston Landing mixed-use development

The facility will also include two floors of Class A laboratory and office space and retail space.

Mixed-Use | Apr 7, 2017

North Hollywood mixed-use development NoHo West begins construction

The development is expected to open in 2018.

Mixed-Use | Apr 5, 2017

SOM-designed ‘vertical village’ is Thailand’s largest private-sector development ever

60,000 people will live and work in One Bangkok when it is completed in 2025.

Urban Planning | Mar 31, 2017

4 important things to consider when designing streets for people, not just cars

For the most part what you see is streets that have been designed with the car in mind—at a large scale for a fast speed.

High-rise Construction | Mar 31, 2017

Ping An Finance Center officially becomes the fourth tallest building in the world

The completed building sits between the Makkah Royal Clock Tower at 1,972 feet and One World Trade Center at 1,776 feet.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021