In Miami, construction of OKO Group and Cain International’s 830 Brickell office tower is nearing completion. The building’s general contractor, Civic Construction, recently topped off construction at 55 stories. When complete later this year, the 724-foot-tall tower will be the first standalone office tower developed in Miami’s urban core in more than a decade, according to a statement from the developers.
Located in Miami’s Brickell Financial District, 830 Brickell was designed by architecture firm Adrian Smith + Gordon Gill, with interiors by Italian architecture and design company Iosa Ghini Associati. Over 60% leased, 830 Brickell has attracted tenants such as Microsoft, Thoma Bravo, A-CAP, CI Financial, Marsh Insurance, AerCap, and WeWork.
The tower’s hotel-style amenities include a rooftop bar/lounge and restaurant that offer views of the City and Biscayne Bay, a health and wellness center, an outdoor terrace, cafés, street-level retail, and conferencing facilities. Together with the developers, the building’s designers have incorporated pandemic-informed features such as ultraviolet lighting in air filtration systems, touchless technologies, and ultraviolet germicidal irradiation (UVGI) sanitation.
830 Brickell’s exterior has over 1 million square feet of uninterrupted glass. Serving as the tower’s podium, an eight-story parking garage is wrapped in a kinetic wall: a sprawling sheet of aluminum squares that move in the wind, reflecting the neighborhood’s movement and light. Nearby transit options include Metrorail and Metromover, the Brightline, walking paths, cycling lanes, and bay access points.
On the Building Team:
Developer: OKO Group and Cain International
Design architect: Adrian Smith + Gordon Gill Architecture
Interior design: Iosa Ghini Associati
Landscape architect: Enea Landscape Architecture
Executive architect: Revuelta Architecture International
General contractor: Civic Construction
Related Stories
Office Buildings | Sep 17, 2018
TaylorMade Canada HQ includes golf laboratory and product showroom
ZZen Design Build was the general contractor for the project.
Office Buildings | Sep 5, 2018
Facebook’s new Frank Gehry-designed Menlo Park HQ extension includes a massive green roof
Level 10 Construction was the general contractor for the project.
Office Buildings | Aug 27, 2018
The open office isn't dead
The degree of open or enclosed doesn't matter in high-performing work environments. If the space is designed to function well, all individual space types are rated as equally effective.
Office Buildings | Aug 17, 2018
An elliptical office building goes with the flow in Boston
Exterior design cuts waste, saves energy, says Building Team members.
Office Buildings | Aug 14, 2018
Flexibility tops office workers' wish lists, followed by healthcare
A survey of 1,000 office workers in the US and UK found that men value health insurance above any other work perk, whereas women would prefer more flexibility in their office job.
Office Buildings | Aug 13, 2018
There's more to the open office than headlines suggest
A study found that contrary to popular belief, the open office did not encourage—but rather, inhibited—face-to-face communication.
Office Buildings | Jul 31, 2018
Office trends 2018: Campus consolidations bring people together
Companies create community-rich work environments where employees can thrive.
Office Buildings | Jul 25, 2018
New study on occupant comfort advances Saint Gobain’s design approach for renovation and new construction
The building products giant gauges its employees’ perceptions of old and new headquarters environments.
Office Buildings | Jul 18, 2018
A day in the life of an ‘agile worker’
When our Gensler La Crosse office relocated last year, we leveraged the opportunity to support an agile workplace strategy (aka, no assigned seating). Here’s what I’ve experienced firsthand.
Office Buildings | Jul 17, 2018
Transwestern report: Office buildings near transit earn 65% higher lease rates
Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.