Williams Design|Build and Williams Construction Management of St. Charles, Ill., announced it has acquired Vasilion Architects of Batavia, Ill. The two firms will now serve as a single source for architecture, design/build, and construction management under the new name Prairie Forge Group. Prairie Forge Group will be led by Thomas M. Tristano as president, David V. Stermetz as vice president and director of construction, and Steven J. Vasilion as director of architecture.
“We have aligned four decades of experience with the expertise of new, innovative team members to further enhance the service offerings we provide to our clients,” said Tristano. “The acquisition of Vasilion Architects was a natural step in our evolution. As we build upon our past resources and success, we remain focused on the core values upon which we established our firm decades ago – quality, people, and service.”
Prairie Forge Group is headquartered in St. Charles, with an office in Kansas City, Mo. The firm provides owners and clients throughout the Midwest region with innovative, timely and economical turnkey solutions. Areas of practice include municipal, parks and recreation, healthcare, commercial, multifamily, historic preservation, and religious and education sectors.
“Regardless of complexity, Prairie Forge Group works to serve as the project advocate from beginning to end,” said Stermetz. “While each project is addressed individually and solutions are tailored to job specifics, one thing remains consistent across the board: we serve our clients efficiently and effectively.”
Prairie Forge Group's completed projects include the Lake Forest Municipal Services Facility in Lake Forest, Ill.; St. Charles Fire Station No. 1; the Schwiebert Riverfront Park in Rock Island, Ill.; and the Bob & Edna Meadows Regional Cancer Care Center at St. Joseph Provena Hospital in Elgin, Ill. The firm has also completed projects for many park districts, recreation departments and municipalities throughout the state of Illinois.
“I am eager to join forces with Tom Tristano and his team,” said Vasilion. “Their vast knowledge and construction expertise is a tremendous resource. I believe in design|build and am thrilled to join forces on this new adventure.” +
Related Stories
Sustainability | Sep 18, 2024
3 living buildings made by a living practice
Prompting humans to reexamine our relationship to the environment, architecture creates the opportunity for us to physically experience ideas of beauty, performance, and structure through the distinct lens of place.
3D Printing | Sep 17, 2024
Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures
Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale.
Retail Centers | Sep 17, 2024
Thinking outside the big box (store)
For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?
Government Buildings | Sep 17, 2024
OSHA’s proposed heat standard published in Federal Register
The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.
Codes and Standards | Sep 17, 2024
New California building code encourages, but does not mandate heat pumps
New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating.
Mass Timber | Sep 17, 2024
Marina del Rey mixed-use development is L.A.’s largest mass timber project
An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.
Education Facilities | Sep 16, 2024
Hot classrooms, playgrounds spur K-12 school districts to go beyond AC for cooling
With hotter weather occurring during the school year, school districts are turning to cooling strategies to complement air conditioning. Reflective playgrounds and roads, cool roofs and window films, shade structures and conversion of asphalt surfaces to a natural state are all being tried in various regions of the country.
Office Buildings | Sep 16, 2024
Maximizing office square footage through ‘agile planning’
Lauren Elliott, RID, NCIDQ, Director of Interior Design, Design Collaborative, shares tips for a designing with a popular and flexible workspace model: Agile planning.
3D Printing | Sep 13, 2024
Swiss researchers develop robotic additive manufacturing method that uses earth-based materials—and not cement
Researchers at ETH Zurich, a university in Switzerland, have developed a new robotic additive manufacturing method to help make the construction industry more sustainable. Unlike concrete 3D printing, the process does not require cement.
Libraries | Sep 12, 2024
How space supports programming changes at university libraries
GBBN Associate Sarah Kusuma Rubritz, AIA, uses the University of Pittsburgh's Hillman Library to showcase how libraries are transforming to support students’ needs.