flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

Mixed-Use

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.


By David Malone, Associate Editor | May 7, 2021

Vital Brookdale, a new mixed-use residential development in Brooklyn’s Brownsville neighborhood, has topped out. The project includes 160 affordable housing units and approximately 25,000-sf of health-focused community space.

The project comprises studios, one-bedroom, two-bedroom, and three-bedroom units with 133 of the apartments reserved for households earning between 30% and 60% of area median income and 26 units earning 80% area median income. In addition to the apartment units, Vital Brookdale will also include resources that promote health and wellness, job training, outdoor green space, and opportunities for recreation.

A second-floor terrace and front and rear courtyards will include landscaping, a dog run, a play area, and active and passive recreation and seating areas. Additional amenities will include building-wide Wi-Fi, a multipurpose community room, a game room, a library/resident co-working space, a fitness room, a laundry room, cold-storage locker and package rooms, and a bike storage room.

In pursuit of Passive House Institute US + 2015 certification for the residential component, the project will include a 100kW roof-mounted solar photovoltaic system, high performance mechanical systems, insulation and windows, LED lighting, and low-flow water fixtures.

The Vital Brookdale project team comprises MDG Design + Construction, Smith & Henzy Advisory Group, The New York Foundling, Monadnock Construction, Dattner Architects, Skyline Engineering, DeNardis Engineering, Starr Whitehouse, and Bright Power.

Related Stories

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Sep 30, 2011

Kilbourn joins Perkins Eastman

Kilbourn joins with more than 28 years of design and planning experience for communities, buildings, and interiors in hospitality, retail/mixed-use, corporate office, and healthcare.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021