flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use development under construction in Detroit’s central business district

Mixed-Use

Mixed-use development under construction in Detroit’s central business district

The development is being built on the former site of the Statler Hotel.


By David Malone, Associate Editor | January 16, 2018
CBD Detroit exterior rendering

Rendering courtesy of City Club Apartments

In 2005, the historic 18-floor, 800-room Statler Hotel was torn down, leaving one of the most exclusive corners in downtown Detroit vacant. Now, over a decade later, a new mixed-use development has broken ground at the corner of Washington Boulevard and Park Avenue.

City Club Apartments — Central Business District (CBD) Detroit will include approximately 288 apartments and penthouses and 13,000 sf of street level space, which will feature a pet store, a restaurant, and a gourmet market. “City Club Apartments—CBD Detroit will combine the service and amenities of a five-star hotel with engaging and connected urban apartment living,” says Jonathan Holtzman, Chairman and CEO of City Club Apartments, in a release.

The new $70 million mixed-use community will feature amenities such as movie theaters, social programming, valet parking, 24/7 concierge services, an entertainment club room with a gourmet kitchen, and wellness and exercise rooms. An indoor/outdoor pool and hot tub will connect to a private park and a dog park will also be available to residents.

 

Outdoor court yard space included in CBA DetroitRendering courtesy City Club Apartments.

 

The residential units will feature exclusively manufactured cabinetry and fixtures. Additionally, advanced and high-speed fiber technologies will be incorporated into the buildings.

20% of the apartments will be affordable. Furnished short-term rentals will also be offered. The apartments and penthouses come in four distinct finish packages and are available in studio, convertible, one-bedroom, and two-bedroom units.

The project is the first ground-up, mixed-use, conventionally financed high-rise to be built in Detroit’s central business district in 30 years. Pre-leasing will begin in summer 2018 with occupancy slated to begin in winter 2018. The Building Team includes BKV Group (architect), Damon Farber (landscape architect), and Wolverine Building Group (contractor).

Related Stories

Mixed-Use | Apr 19, 2021

BIG unveils design for the new OPPO R&D Headquarters in Hangzhou’s Future Sci-Tech City

The project sits between a natural lake, an urban center, and a 10,000-sm park.

Mixed-Use | Apr 16, 2021

Wrigleyville Lofts to bring 120 apartment units to Chicago’s Wrigleyville neighborhood

The project will also include 14,000 sf of ground floor retail.

Mixed-Use | Apr 8, 2021

New mixed-use development under construction at Naperville’s CityGate Centre

The project will comprise 285 multifamily units and the shell for a future event center.

Mixed-Use | Apr 7, 2021

New mixed-use rental community breaks ground in Chicago’s Bronzeville neighborhood

The building marks the latest phase of the Oakwood Shores revitalization plan.

Mixed-Use | Mar 22, 2021

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.

Mixed-Use | Mar 9, 2021

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.

Mixed-Use | Mar 8, 2021

Chicago’s South Side to receive new Entrepreneurial and Community Hub

SOM and TnS Studio will lead the design.

Mixed-Use | Feb 24, 2021

Skanska completes primary construction work on Nashville’s largest ever mixed-use project

Gresham Smith is serving as architect-of-record for the entire project and is part of the design team with Pappageorge Haymes and Gensler.

Mixed-Use | Feb 22, 2021

Mixed-use development will occupy former manufacturing industrial site near the Chicopee River

Paul A. Castrucci Architects is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021