Dubai’s skyline will claim another architectural world title in 2020 when construction completes on the world’s tallest building with a ceramic facade. The twisted mixed-use Wasl Tower will rise 300 meters and comprise a five-star Mandarin Oriental hotel, private residences, and a variety of restaurants. The Mandarin Oriental Hotel Group will manage both the hotel and residences.
257 guestrooms, suites, and serviced apartments will be located on floors 16 to 38 and provide views of the nearby Burj Khalifa. 144 residential units will be located on the tower’s top floors. They will have their own private access and dedicated facilities, such as a Resident’s Lounge. Residents will also benefit from the Mandarin Oriental’s service and direct access to the hotel.
Courtesy UNStudio.
A variety of restaurants and bars will be featured in the building such as a rooftop skybar, an all-day dining venue, a poolside bar and restaurant, a lobby lounge, a club lounge, a cigar room, and a Mandarin Oriental Cake Shop. A double level sky lobby on floors 35 and 36 will include the club lounge, the all-day dining venue, a lifestyle lounge, and a tea lounge. Banqueting and meeting spaces will accommodate social and business events.
The Spa at Mandarin Oriental, a two-story facility, will feature 12 private treatment rooms, a fitness center, vitality pools, heat and water therapies, and an outdoor swimming pool set within a landscaped garden terrace.
Courtesy UNStudio.
At night, solar-powered lights will be programmed to make it appear as if the ceramic-clad building is breathing (see video below). The tower’s structural system consists of a central concrete core plus outriggers on four levels.
UNStudio designed the building in collaboration with German engineering firm Werner Sobek.
Related Stories
Market Data | Jan 29, 2021
The U.S. hotel construction pipeline stands at 5,216 projects/650,222 rooms at year-end 2020
At the end of Q4 ‘20, projects currently under construction stand at 1,487 projects/199,700 rooms.
Modular Building | Jan 26, 2021
Offsite manufacturing startup iBUILT positions itself to reduce commercial developers’ risks
iBUILT plans to double its production capacity this year, and usher in more technology and automation to the delivery process.
Giants 400 | Dec 16, 2020
Download a PDF of all 2020 Giants 400 Rankings
This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.
Giants 400 | Dec 3, 2020
2020 Hotel Sector Giants: Top architecture, engineering, and construction firms in the U.S. hospitality sector
Gensler, Jacobs, and Suffolk Construction top BD+C's rankings of the nation's largest hotel sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
Hotel Facilities | Nov 3, 2020
Hotel made from CLT opens at Fort Jackson, S.C.
This project used over 4,100 pieces of cross-laminated timber. It's the fourth CLT hotel in the Army's housing portfolio.
Hotel Facilities | Oct 27, 2020
Hotel construction pipeline dips 7% in Q3 2020
Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.
Hotel Facilities | Sep 22, 2020
‘Lifestyle’ is adding new color to the select-service hotel sector
A new WATG Strategy white paper examines the design characteristics of the blending.
Giants 400 | Aug 28, 2020
2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms
The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.
Coronavirus | Aug 25, 2020
Video: 5 building sectors to watch amid COVID-19
RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.