flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use, mixed-income development under construction in Salt Lake City

Mixed-Use

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.


By David Malone, Associate Editor | March 22, 2021
225 South Slate Street ground level

Renderings courtesy KTGY Architecture + Planning

Construction has commenced at 225 South Slate Street in downtown Salt Lake City, a 190-unit, mid-rise and high-rise, mixed-use community. The transit-oriented development will add affordable housing, commercial tenants, non-profit arts organizations, a food hall, an event space, and live-work units to enhance the city’s downtown business district.

The development comprises two towers, one rising eight stories and one rising 12. The 190 residential units are split between the towers with 168 units designated affordable for renters earning between 20% and 80% of the area median income. The units will include a mix of studio, one-, two-, three-, and four-bedroom apartments. Two at-grade artist live-work spaces are also included and will allow the development to appeal to young professional singles and families alike.

 

225 South Slate Street in Salt Lake City

 

The two mixed-use buildings are connected by an open-air paseo that connects them to the new development to the adjacent commercial uses, including a coffee shop, a record store, and neighborhood creative office space. “Commercial tenants, event space, food hall and live-work units will line the paseo on the ground floors, while the residential units are located on the upper levels. The food hall, which is unique to the community, will draw lunch-time workers during the day and urban dwellers at night,” said Keith McCloskey, LEED AP, Associate Principal, KTGY, in a release.

The eight-story tower will utilize standard construction techniques and materials while the 12-story tower will leverage a steel structural system by Infinity Structures aimed at shortening the overall construction timeline and achieving more affordable construction costs. Construction for the entire project is estimated to take 24 months.

 

225 South Slate Street paseo

 

225 South Slate Street aerial

Tags

Related Stories

Mixed-Use | Jul 14, 2020

Apartments and condos occupy what was once a five-story car dealership

Wisznia | Architecture+Development designed, developed, and is managing the project.

Mixed-Use | Feb 21, 2020

SB Architects to design Fort Lauderdale’s FATVillage mixed-use destination

The project will build upon the existing FATVillage Arts District.

Mixed-Use | Feb 14, 2020

Kenya’s Pinnacle Tower will be the tallest tower in Africa

ArchGroup Consultants is designing the project.

Sustainability | Feb 12, 2020

KPF unveils The Pinnacle at Central Wharf, a high-performance, resilient tower

The project will reconnect Downtown Boston to the waterfront.

Mixed-Use | Feb 11, 2020

KTGY unveils designs for Downtown Superior’s Main Street mixed-use portion

The development will be built in Superior, Colo.

Mixed-Use | Feb 7, 2020

Rising to the occasion

Roof deck entertainment spaces are popular amenities that present engineering and code complexities.

Mixed-Use | Jan 27, 2020

Dubai’s One Za’abeel will have the world’s largest cantilever

Nikken Sekkei is designing the project.

Mixed-Use | Jan 17, 2020

RMJM designs conjoined, twisting towers in Hengyang, China

The towers will rise 580 feet.

Mixed-Use | Dec 18, 2019

BIG unveils River Street Waterfront Master Plan for Williamsburg

The project is a collaboration between BIG, Two Trees Management, and James Corner Field Operations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021