flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Mixed-use, mixed-income development under construction in Salt Lake City

Mixed-Use

Mixed-use, mixed-income development under construction in Salt Lake City

KTGY Architecture + Planning is designing the project.


By David Malone, Associate Editor | March 22, 2021
225 South Slate Street ground level

Renderings courtesy KTGY Architecture + Planning

Construction has commenced at 225 South Slate Street in downtown Salt Lake City, a 190-unit, mid-rise and high-rise, mixed-use community. The transit-oriented development will add affordable housing, commercial tenants, non-profit arts organizations, a food hall, an event space, and live-work units to enhance the city’s downtown business district.

The development comprises two towers, one rising eight stories and one rising 12. The 190 residential units are split between the towers with 168 units designated affordable for renters earning between 20% and 80% of the area median income. The units will include a mix of studio, one-, two-, three-, and four-bedroom apartments. Two at-grade artist live-work spaces are also included and will allow the development to appeal to young professional singles and families alike.

 

225 South Slate Street in Salt Lake City

 

The two mixed-use buildings are connected by an open-air paseo that connects them to the new development to the adjacent commercial uses, including a coffee shop, a record store, and neighborhood creative office space. “Commercial tenants, event space, food hall and live-work units will line the paseo on the ground floors, while the residential units are located on the upper levels. The food hall, which is unique to the community, will draw lunch-time workers during the day and urban dwellers at night,” said Keith McCloskey, LEED AP, Associate Principal, KTGY, in a release.

The eight-story tower will utilize standard construction techniques and materials while the 12-story tower will leverage a steel structural system by Infinity Structures aimed at shortening the overall construction timeline and achieving more affordable construction costs. Construction for the entire project is estimated to take 24 months.

 

225 South Slate Street paseo

 

225 South Slate Street aerial

Tags

Related Stories

| Feb 13, 2014

Related Companies, LargaVista partner to develop mixed-use tower in SoHo

The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.

| Feb 5, 2014

Extreme conversion: Atlanta turns high-rise office building into high school

Formerly occupied by IBM, the 11-story Lakeside building is the new home for North Atlanta High School.

| Jan 29, 2014

Notre Dame to expand football stadium in largest project in school history

The $400 million Campus Crossroads Project will add more than 750,000 sf of academic, student life, and athletic space in three new buildings attached to the school's iconic football stadium. 

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Apr 30, 2013

First look: North America's tallest wooden building

The Wood Innovation Design Center (WIDC), Prince George, British Columbia, will exhibit wood as a sustainable building material widely availablearound the globe, and aims to improve the local lumber economy while standing as a testament to new construction possibilities.

| Mar 3, 2013

Hines acquires Archstone's interest in $700 million CityCenterDC project

The Washington D.C. office of Hines, the international real estate firm, announced the acquisition of the ownership interest of their partner, Archstone, in the mixed-use CityCenterDC project that is currently under construction in downtown Washington, D.C.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

| Jul 12, 2012

EE&K and Knutson Construction selected for the Interchange in Minneapolis

Design-build contract for $79.3 million transportation hub will connect transit with culture.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021