flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MLK Plaza brings 167 units of affordable housing to the Bronx

Multifamily Housing

MLK Plaza brings 167 units of affordable housing to the Bronx

The project was financed by the City’s ELLA program.


By David Malone, Associate Editor | March 6, 2019
MLK Plaza exterior

Photo credit: Miguel de Guzman / ImagenSubliminal

Magnusson Architecture + Planning recently completed work on MLK Plaza, a 13-story, 167-unit affordable residential building in the Bronx. The development includes 25 studios, 57 one-bedroom units, 60 two-bedroom units, and 24 three-bedroom units. 100% of the apartments will be affordable to very low-income renters.

MLK Plaza residents will have access to recreation and community rooms, a rear patio, and a gym on the seventh floor with an adjacent outdoor terrace. The gym and terrace are part of active design interventions to encourage physical health. Their location on the seventh floor is midway between the top and bottom floors to encourage residents to use the stairs. The stairwells also incorporate active design principles such as double height landings and windows for natural light and views.

 

Exterior MLK PlazaPhoto credit: Miguel de Guzman / ImagenSubliminal.

See Also: Sweden’s tallest timber building is open for business

 

The exterior features dark gray brick as a nod to the neighborhood’s industrial past. Metal panels with a gold hue were also used on the exterior to provide a bright counterpoint to the brick. A fully-glazed double-height corner lobby is framed by diagonal columns. The lobby provides natural daylight to the ground floor during the day and creates street-level illumination at night. One of the lobby’s walls includes a mural of MLK.

The development was designed to achieve LEED Platinum.

 

MLK Plaza terracePhoto credit: Miguel de Guzman / ImagenSubliminal.

 

MLK Plaza unit interiorPhoto credit: Miguel de Guzman / ImagenSubliminal.

 

MLK Plaza exterior lobbyPhoto credit: Miguel de Guzman / ImagenSubliminal.

 

MLK Plaza fitness centerPhoto credit: Miguel de Guzman / ImagenSubliminal.

 

MLK Plaza terracePhoto credit: Miguel de Guzman / ImagenSubliminal.

 

MLK muralPhoto credit: Miguel de Guzman / ImagenSubliminal.

 

Related Stories

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Oct 17, 2011

Austin's newest urban apartment complex under construction

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021