flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Multifamily and Specialized Housing projects honored in 2016 AIA Housing Awards

Multifamily Housing

Multifamily and Specialized Housing projects honored in 2016 AIA Housing Awards

A San Francisco low-income mixed-use complex, a Los Angeles homeless veterans housing facility, and a series of student residential buildings at UMass were among the winners.


By BD+C Staff | April 7, 2016
Multifamily and Special Housing projects honored in 2016 AIA Housing Awards

Cloverdale749. Photo: Lawrence Anderson/LOHA

As part of its 2016 Housing Awards program, the American Institute of Architects (AIA) named five recipients in the Multifamily Housing and Specialized Housing categories. The program also honored five projects in the One/Two Family Custom Housing category.

The jury for the AIA Housing Awards was comprised of Jamie Blosser, AIA (Chair), Atkin Olshin Schade Architects; Ariella Cohen, Editor-in-Chief, Next City; Kevin Harris, FAIA, Kevin Harris Architect; David Lee, FAIA, Stull and Lee, Inc.; and Suman Sorg, FAIA, Sorg & Associates, P.C.

Here's a look at the winners in the Multifamily and Specialized Housing sectors:

 

Multifamily

 

1180 Fourth Street | San Francisco | Architect: Mithun | Solomon (initiated as WRT/Solomon E.T.C.) | Associate Design Architect: Kennerly Architecture & Planning

Photo: Bruce Damonte/Mithun

Completed in 2014, the mixed use1180 Fourth Streetcomplex contains 150 low-income and formerly homeless households. It sits on a 1.4-acre site at the entrance of San Francisco’s Mission Bay South neighborhood. Mithun designed the building to bring residents together with common rooms, community gardens, and a daycare center. The layout includes 10,000 sf of commercial space.Jury member comment: “San Francisco sorely needs affordable housing, and this is a perfect location re: transit and accessibility.”

 

 

Cloverdale749 | Los Angeles | Lorcan O'Herlihy Architects

Photo: Lawrence Anderson/LOHA

Decks, windows, patios, and walkway placements allowed Lorcan O'Herlihy Architects (LOHA) to merge private and public space in theCloverdale749. The 10,500-sf building was completed in 2014. Passively sustainable elements in the exterior white form cladding reduces the solar heat load on the building and makes it easier to cool.Jury member comment: “Very well thought out, detailed, and elegant resolution from a simple, rather banal ships container reference.”

 

 

Specialized Housing

 

Commonwealth Honors College, University of Massachusetts, Amherst | Amherst, Mass. | William Rawn Associates, Architects

Photo: Robert Benson Photography/William Rawn Associates, Architects

The 500,000-sf Commonwealth Honors College Community has seven new buildings and added 1,500 total beds in single-rooms, double-rooms, suites, and apartments. The buildings are situated around hillside courtyards. Students that live there can socialize in open outdoor quads. The $192 million LEED Silver project also has classrooms, offices, and a 24-hour cafe. Jury member comment: “They spent so much time on careful spaces for social engagement.”

 

 

Homeless Veterans Transitional Housing, VA Campus | Los Angeles | Leo A Daly

Photo: Lawrence Anderson/Leo A Daly

Architecture firm Leo A Daly took a long-vacant building on VA’s West Los Angeles medical campus and repurposed it into a home for 65 homeless veterans. The three-level complex has 45 single apartments, 10 double apartments, a kitchen, fitness room, and communal sitting areas. One wing has access to a “serenity garden.” The renovations to the 51,000-sfBuilding 209 cost $20 million and took two years to finish (it was completed in 2015).Jury member comment: “Spaces, landscaping, and rooms afford a believable sense of importance of and gratitude towards the residents."

 

 

Whitetail Woods Regional Park Camper Cabins | Farmington, Minn. | HGA

Camper cabins at Whitetail Woods Regional Park. Photo: Paul Crosby & Peter VonDeLinde/HGA

Threecamper cabinsare built into the crest of a hill at Whitetail Woods Regional Park in Minnesota. Even with only 227 sf, the cabins have two full-size bunk beds, dining and sitting areas, a sleeper sofa, and floor-to-ceiling glass doors. The cabins forgo mechanical cooling because they receive enough shade from the surrounding trees. Each cabin has a 80-sf deck made of red cedar glulam chassis, cedar and pine framing, and red cedar cladding.Jury member comment: “The light footprint is lovely and the low impact on the environment is wonderful.”

Related Stories

Multifamily Housing | Jul 24, 2019

Multifamily transformation: Historic mansion converted to short-term housing for homeless families

The 1885 Victorian home in Cambridge, Mass., gets a new, energy-efficient life as Renae's Place, short-term housing for homeless women and their children.

Multifamily Housing | Jul 23, 2019

Is prefab in your future?

The most important benefit of offsite construction, when done right, is reliability.

Multifamily Housing | Jul 17, 2019

What multifamily developers are saying about Ori Living's robotic interior system

This robotically controlled, space-saving furniture system can add more than 100 square feet of usable space to apartment units.

Multifamily Housing | Jul 17, 2019

Robotic interiors: How to make a studio apartment feel as big as a one-bedroom unit

Meet Ori Living's robotically controlled, space-saving furniture system. 

Multifamily Housing | Jul 17, 2019

Cost of living: Apartment construction costs for 2019

Using RSMeans data from Gordian, here are the most recent construction costs for low-rise and mid-rise apartment buildings across 10 U.S. cities.

Multifamily Housing | Jul 15, 2019

Call for entries: Student housing roundup

We're looking for the best new "student housing" communities for our Fall Issue of Multifamily Design+Construction.

Multifamily Housing | Jul 15, 2019

7 new multifamily developments to track this summer

Ballpark living in Anaheim, Calif., and a water-friendly apartment complex in Seattle highlight the noteworthy multifamily developments to open in 2019. 

Multifamily Housing | Jun 27, 2019

David Baker Architects wins 2019 HUD 'best in affordable housing' honor

The firm's Williams Terrace project is the first dedicated housing for Charleston, S.C.’s low-income seniors. It's one of four developments to win 2019 AIA/HUD housing awards. 

Building Tech | Jun 26, 2019

Modular construction can deliver projects 50% faster

Modular construction can deliver projects 20% to 50% faster than traditional methods and drastically reshape how buildings are delivered, according to a new report from McKinsey & Co.

Design Innovation Report | Jun 25, 2019

2019 Design Innovation Report: Super labs, dream cabins, office boardwalks, façades as art

9 projects that push the limits of architectural design, space planning, and material innovation.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021