flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M+W Group acquires LifeTek Solutions in America

M+W Group acquires LifeTek Solutions in America

 

Acquisition intended to strengthen M+W's technological and process expertise in the Life Sciences industry.


By BD+C Staff | March 29, 2013

 

The global engineering and construction company M+W Group has announced 
that their operations in the Americas have acquired 100% ownership of LifeTek 
Solutions, Inc. With this acquisition, M+W Americas also obtains LifeTek’s 
25% share in the exclusive SmartFit Modular BioSuites and FillSuites.
 
LifeTek’s team of industry recognized experts specialize in developing technically 
driven projects in the pharmaceutical and biotechnology communities. Adept in the 
design of equipment and arrangements for these projects, the LifeTek team has the 
operating, maintenance, design, construction, and qualification background that 
founds a thorough understanding of how best to compose a manufacturing process 
and ensure their customers success. Their exclusive SmartFit modular BioSuites 
and FillSuites cut delivery time in half while providing proven field-tested 
performance. 
 
“Emerging technologies in the Life Science industries are transforming the way 
therapeutics are manufactured. The synergy between M+W Group and LifeTek will 
bring a world of innovative technology and expertise to our clients, assisting them to 
embrace new processes and streamline project delivery.” said Rick Whitney, 
President and CEO of M+W Americas.
 
“We are very excited about this acquisition.” commented George Wiker, Principal of 
LifeTek. “Together, M+W Group and LifeTek will provide customers with unmatched 
engineering depth in a single-firm solution from concept to start-up.”
 
 
About M+W Group (www.mwgroup.net): M+W Group is the leading global engineering, 
construction and project management company in the fields of Advanced Technology 
Facilities, Life Science & Chemicals, Energy & Environment Technologies and High-Tech 
Infrastructure. From concept development to turnkey services the company manages projects 
of all sizes ensuring rapid realization, high quality standards and cost-effective completion. 
With its competence to link process and automation technologies and complex facilities to 
integrated solutions M+W Group primarily focuses on leading companies in the fields of 
electronics, photovoltaics, life science, chemicals, energy, automotive, security and 
communication, as well as research institutes and universities. M+W Group is the holding 
company with headquarters in Stuttgart, Germany. In 2011 the company generated an order 
intake of $3.6 billion and revenues of $3.5 billion with more than 7,000 employees. In 2012 
M+W Group celebrated its 100th anniversary.
 
M+W Group is owned by the Austrian Stumpf Group that is globally successful in the areas of 
High-Tech Engineering, Smart & Renewable Energy, Real Estate and Technology 
Investments.
 
About LifeTek (www.lifetek.com): LifeTek is a design and consulting team who work to help 
BioPharm companies succeed in developing processes, build manufacturing capacity as well 
as establish & maintain compliance. LIFETEK focuses exclusively on pharmaceutical and 
biological projects with a strong understanding that the design of a pharmbio project begins 
with the process, whether it is a laboratory, pilot plant, or full scale manufacturing 
facility. LifeTek’s philosophy is to provide a unique solution to the needs of its client base by 
providing standard and validateable process designs and process systems to improve 
delivery, reduce cost and assure successful startup while minimizing risk.
About SmartFit Modular (www.smartFit.com): SmartFit Modular offers complete 
bioprocessing and aseptic filling suites which can be erected within an existing building, 
anywhere in the world. SmartFit suites can accommodate projects from development through 
market launch. The affordable solution can speed the rate of return on the investment.
 
Source: M+W Group

Related Stories

| Aug 29, 2012

BOND completes South Cove Community Health Center

$11 million, 21,000 square foot community health center opens in Quincy, Mass.

| Aug 28, 2012

McCarthy begins construction on transportation center at Bob Hope Airport

Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferguson joins JE Dunn Construction

Feruson's business development efforts at JE Dunn will focus on the new initiative of pursuing large corporate re-stacks and high-end interior build-outs.

| Aug 15, 2012

Skanska to build the Beacon High School in New York City

The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021