Nine and a half acres may sound like adequate space for a 70,000-sf building, but when that acreage is shoehorned into a narrow corridor, problems can quickly arise. Such was the case for the LA Metro Division 14 Expo Light Rail Operations & Maintenance Facility.
To make the building site work, the design team needed to make as efficient use of the space as possible. Building spaces overlap over the rail yard and maintenance area and 34-foot-long moment frames span two tracks. Part of the building’s main hallway hangs over the maintenance area, as well.
To account for the OCS and pantograph and still meet California’s seismic requirements, open-span moment frames that allow train travel were used in the north-south direction in combination with brace frames in the other direction.
The design of the long, narrow building is more than just a product of its location. The facility goes beyond the basic functionality requirements of a typical operations and maintenance facility and promotes employee wellbeing and integrates into the surrounding neighborhood. The building incorporates plenty of natural light and is net-zero-energy ready and on track to attain LEED Gold certification.
Natural light played a huge role in the design team’s quest to incorporate the latest research in design for workplace wellbeing. Large skylights above the maintenance area fill the space with natural daylight while large roof vents naturally exhaust heated air. A floor-to-ceiling glazed curtain wall provides natural light and views to operations administrative offices, the control suite, and the operators room and amenities.
The site’s narrow dimensions heavily influenced the building’s design and led to the overlapping of some building spaces. Chang Kim photograph.
Building – Submitting firm, architect RNL Design Owner Los Angeles County Metropolitan Transportation Authority Structural engineer Nabih Youssef & Associates Structural Engineers MEP engineer Glumac
General Information – Size 70,000 sf Cost $100 million Construction time October 2011 to April 2016 Delivery method Design-bid- build
Related Stories
Giants 400 | Aug 11, 2021
BD+C Awards Programs
Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400
Building Team Awards | Mar 12, 2021
2021 Building Team Awards Entry Information
Only new construction projects completed on or after January 1, 2020 are eligible. Deadline for submissions: May 14, 2021.
Building Team Awards | Mar 12, 2021
Deadline extended for the 2021 Building Team Awards
BD+C's Building Team Awards is the industry's only recognition program to honor projects that achieve excellence in both design/construction and collaboration of the AEC/O team. Deadline for entries: May 14, 2021.
Building Team Awards | Nov 4, 2020
12 projects earn BD+C's 2020 Building Team Awards
The Statue of Liberty Museum, Allianz Field, and the Long Beach Civic Center are three of the projects awarded with BD+C's 2020 Building Team Awards.
Building Team Awards | Nov 3, 2020
Birmingham's haven for the homeless
A coalition of ministries raised millions to build a new home for homeless men in Alabama’s largest city. The Firehouse Shelter wins Honorable Mention in the 2020 Building Team Awards.
Building Team Awards | Nov 2, 2020
It's back to the future for this contractor
Poettker Construction’s new headquarters in rural Breese, Ill., is recognized with a Bronze Award in BD+C’s 2020 Building Team Awards.
Building Team Awards | Nov 2, 2020
Long Beach gets a municipal marvel
The Long Beach Civic Center is honored with a Bronze Award in the 2020 Building Team Awards.