Municipalities and their residents can be fickle and unpredictable in their attitudes toward new construction. Objections about a building’s height or jobsite’s noise and traffic have been known to delay, and even halt, projects, which is why developers and AEC teams spend more time these days on community outreach.
A case in point can be found is Nashville, Tenn., one of the country’s hotter real estate markets, where developers are looking to plant their flags and make an impression. Indianapolis-based Buckingham Cos., a development and property management company, has proposed building a 38-story, 300,000-sf residential skyscraper that would be 14 stories higher than current zoning allows.
Buckingham and its architect, New York-based Skidmore, Owings & Merrill, are trying to convince local officials and neighbors that a taller, narrower high rise would be better than a shorter building with the same square footage. Why? Because it would block less sunlight on pools of surrounding residential buildings, such as Terrazzo, a condo-office building next door to the half-acre parking lot on which Buckingham wants to erect its tower.
The Nashville Business Journal reports that the developer presented “sunlight studies” as part of its sales pitch to city officials during a Sept. 1 meeting. That same afternoon, the developer met with residents of several high rises near the proposed project, to ensure them that the new building wouldn’t unduly impede their balcony views or swimming experiences.
(The tire maker Bridgestone, which is currently building its U.S. headquarters in Nashville, had to deal with similar issues with residents living in a shorter condo building next door to its proposed tower.)
The design review committee of Nashville’s Metropolitan Development and Housing Agency has already given its unanimous conceptual approval to Buckingham’s tower, pending an approval by the city’s Board of Zoning Appeals, which is scheduled to address the tower’s height variance request on Sept. 17. Doug Sloan, acting executive director of Nashville’s planning department, has also expressed concern about the materials this building will use and how it will look from the highway.
If all goes as planned, Buckingham and its building team expect to start construction on the 200-plus-room tower next year, and open the building by 2018.
However, developers are likely to find themselves playing defense in the future, as long as they keep trying to squeeze just one more building onto the tiniest of desirable urban spaces. In Chicago, BJB Partners, which owns an apartment building at Millennium Park Plaza, has proposed a 41-story residential/hotel tower on a plot of land that, according to Crain’s Chicago Business, is “smaller than a tennis court.” And CCTV America last month reported on the trend toward “skinny” luxury residential skyscrapers in New York, including one under construction that’s less than 60 feet wide.
Related Stories
| Feb 13, 2013
'Vegetative tower' apartments to revive NYC site
A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 2, 2012
San Francisco lays claim to the greenest building in North America
The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.
| Jun 13, 2012
Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal
This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.
| Jun 8, 2012
Thornton Tomasetti/Fore Solutions provides consulting for renovation at Tufts School of Dental Medicine
Project receives LEED Gold certification.
| Jun 6, 2012
KPF designs tower for Yongsan IBD
The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.
| Jun 6, 2012
SOM urges Chicago tenants to partner with landlords to cut energy use
Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.