A new residential tower, dubbed Alcove, set to rise at 900 Church Street in Nashville will be the first residential building adjacent to the 17-acre Nashville Yards development.
Designed by Goettsch Partners, the new 34-story, 416-foot-tall tower will feature 356 units and total more than 375,800 sf. The building is designed as a series of stacked, shifted cubes organized in pairs on four levels. This arrangement opens up the inner sections of the project to create unique views and alcoves for building residents.
Currently, the 356 residential units are designed for flexibility as either apartments or condominiums with 32 studios, 224 one-bedroom units, and 100 two-bedroom units. The building facade uses an intricate window wall that features two varying shades of glazed panels, which frame floor-to-ceiling glass for each unit.
See Also: 'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification
The project will feature a number of rooftop amenities such as a game room, a business center, private dining with a catering kitchen, a lounge, and a pool deck. Signature amenity spaces will be placed within four wood-finished aluminum cutouts that feature communal outdoor terraces. Two of the 75-foot-tall terraces will face east toward the Nashville skyline while the other two will face west. The project will also feature package delivery and retrieval systems and two pools: a rooftop lap pool with a six-inch-deep sun shelf and a glass-bottom pool that overhangs the 27th floor amenity terrace on the building's west side.
Goettsch Partners is designing both the building and the interior layouts.
Related Stories
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 19, 2012
Rental market pushing service, ‘community’
The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.
| Jul 9, 2012
Modular Construction Delivers Model for New York Housing in Record Time
A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.
| Jul 9, 2012
Oakdale, Calif., Heritage Oaks Senior Apartments opens
New complex highlights senior preferences for amenities.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 2, 2012
Building Team completes two additions at UCLA
New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project.