The National Fenestration Rating Council (NFRC) ANS Standards Committee has a new U-factor standard open for public comment.
NFRC approved a plan to submit a previously unimplemented, member-approved ballot change to NFRC 100; Procedure for Determining Fenestration Product U-factors. The public review and comment period is scheduled to run from April 28 to May 28, 2017.
A change to Section 5.9.3.1.3.D open to public comment appeared in Standards Action on April 28, 2017. With the document section being available in fewer than five pages, the comment period will be 30 days, closing on May 28, 2017.
The document up for review (with changes from previous version shown in underline/strikethrough format), additional details, and applications for joining the Committee are available on the ANS Standards Committee group page, which is open to the public.
Questions may also be directed to Robin Merrifield at 240-821-9513.
Related Stories
Codes and Standards | Jan 10, 2019
Ontario building first to achieve zero-carbon designation by Canada GBC
Geothermal heating, living wall among notable features.
Codes and Standards | Jan 9, 2019
Policymakers need to act to alleviate affordable housing crunch
Moody’s economist says costs including mortgage rates worsening situation.
Codes and Standards | Jan 8, 2019
Pittsburgh launches task force on construction industry fraud
Focus will be on wage violations.
Codes and Standards | Jan 7, 2019
Program uses low-cost sensors to monitor impact of stormwater mitigation systems
University/municipal partnership in Philadelphia aims to improve green infrastructure design.
Codes and Standards | Jan 7, 2019
Washington, D.C., to transition to 100% renewable energy by 2032
Includes measures to reduce emissions from buildings and transportation.
Codes and Standards | Jan 4, 2019
Canada’s National Building Code will include climate change obligations
New durability requirements for new buildings in the works.
Codes and Standards | Jan 4, 2019
LEED v4.1 beta registration begins in January
First releases are O+M, BD+C, and ID+C.
Codes and Standards | Jan 3, 2019
U.S. Appeals Court says general contractors can be cited for subcontractor violations
Ruling will prompt review of OSH decision that said GCs cannot be held liable for subs’ violations.
Codes and Standards | Jan 3, 2019
Tall mass timber code changes receive final approval
New provisions to be included in the 2021 International Building Code.
Codes and Standards | Jan 2, 2019
ASHRAE’s Low-Rise Residential Buildings standard update now available
Performance measures are at least 50% more efficient than 2006 IECC.