The National Fenestration Rating Council (NFRC) ANS Standards Committee has a new U-factor standard open for public comment.
NFRC approved a plan to submit a previously unimplemented, member-approved ballot change to NFRC 100; Procedure for Determining Fenestration Product U-factors. The public review and comment period is scheduled to run from April 28 to May 28, 2017.
A change to Section 5.9.3.1.3.D open to public comment appeared in Standards Action on April 28, 2017. With the document section being available in fewer than five pages, the comment period will be 30 days, closing on May 28, 2017.
The document up for review (with changes from previous version shown in underline/strikethrough format), additional details, and applications for joining the Committee are available on the ANS Standards Committee group page, which is open to the public.
Questions may also be directed to Robin Merrifield at 240-821-9513.
Related Stories
Codes and Standards | Dec 5, 2018
Canadian retailer builds net-zero stores
Other chains also boost green efforts with PVs, EV charging stations.
Codes and Standards | Dec 4, 2018
Action on building codes would spur low-carbon cities
Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.
Codes and Standards | Nov 30, 2018
Best solution to prevent California wildfire disasters: Stop building in places likely to burn
Approach would be unpopular as people attracted to stunning wooded landscapes.
Codes and Standards | Nov 29, 2018
USGBC and BRE form partnership
Two green standards groups will collaborate on standards, platforms, and research.
Codes and Standards | Nov 29, 2018
Parking garages in N.Y. State will have to be inspected every three years
Professional engineer must assess conditions.
Codes and Standards | Nov 28, 2018
To build water-efficient cities, water managers and urban planners must coordinate better
Lack of time and resources, and practitioners not in habit of working together hamper efforts.
Codes and Standards | Nov 27, 2018
AAMA updates specification for roller assemblies in sliding doors, and lift and slide doors
Last update was in 2015.
Codes and Standards | Nov 26, 2018
All LEED-certified buildings eligible for LEED recertification
Projects must submit 12 months of data demonstrating continued or improved performance.
Codes and Standards | Nov 20, 2018
OSHA publishes updates to crane operator certification requirements
Long-delayed rules accept certifications by type or type and capacity.
Codes and Standards | Nov 19, 2018
Guide offers understanding of elements that create successful multi-floor communal spaces
CTBUH technical document analyzes how to approach tall urban habitat.