flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A negative emissions power plant is now operational in Iceland

Sustainability

A negative emissions power plant is now operational in Iceland

The geothermal power plant in Hellisheidi, Iceland was outfitted with a Climeworks DAC module.


By David Malone, Associate Editor | October 16, 2017
The Hellisheidi power plant

Photo: Arni Saeberg

Climeworks, a Swiss cleantech company, has partnered with Reykjavik Energy to combine direct air capture (DAC) technology with safe and permanent geological storage for the first time ever. The result is the first negative emissions power plant in the world.

The EU-backed collaborative research project centers around one of the world’s largest geothermal power plants in Hellisheidi, Iceland. A Climeworks DAC module was installed on-site to capture CO2 from ambient air. The Climeworks technology draws in ambient air and captures the CO2 with a patented filter. Then, the filter is heated with low-grade heat from the geothermal plant to release the pure CO2.

 

Climeworks InforgraphicCourtesy Climeworks.

 

The captured CO2 is then bound to water and sent more than 700 meters underground. Once it reaches its underground location, the CO2 reacts with the basaltic bedrock and forms solid minerals to create a permanent storage solution.

 

A Basalt core containing carbonatesBasalt core containing carbonatesPhoto: Sandra O Snaebjornsdottir.

 

The project will test how the highly scalable technology works with the specific weather conditions at the location in southwest Iceland.

 

A Climeworks DAC modulePhoto: Climeworks / Zev Starr-Tambor.

Related Stories

Sustainability | Nov 8, 2019

South Korea plans to build three hydrogen-powered cities by 2022

The Ministry of Land, Infrastructure, and Transport is in charge of the project.

Wood | Oct 24, 2019

Could mass timber be a game changer for stadium design?

Projects throughout the U.S. and Canada showcase the design and environmental traits of large-scale wood sports facilities. 

Sustainability | Aug 15, 2019

Paris will soon be home to the world’s largest rooftop farm

Agripolis is spearheading the project.

Sustainability | Jun 7, 2019

Workplace wellness: Top 3 tips for Fitwel certification

How can thoughtful design encourage healthier choices, lifestyles, and work environments?

Sustainability | May 28, 2019

Carrier’s world headquarters in Florida goes green

The structure is the first commercial building in Florida to achieve LEED Platinum v4 Certification.

Resiliency | Apr 22, 2019

Turner Construction doubles down on jobsite efficiency

The company targets a 50% cut in greenhouse gas emissions and water use from construction activities by 2030.

Sustainability | Apr 5, 2019

BIG unveils vision for a sustainable, floating city

The project is dubbed Oceanix City.

Sustainability | Mar 25, 2019

This is the world’s first Sustainable SITES Initiative v2 Platinum project

The building is part of the Phipps Conservatory and Botanical Gardens in Pittsburgh.

Sustainability | Feb 20, 2019

Studio NAB’s Superfarm project creates an entire ecosystem in an urban environment

The Superfarm will go beyond what vertical farms typically produce.

boombox1
boombox2
native1

More In Category


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021