Apple Park, the $5 billion Apple headquarters building in Cupertino, Calif., is as futuristic an office as you are likely to find. In order to create a sleek, futuristic aesthetic for employees, the complex’s design incorporated an extensive amount of glass walls and partitions. While the glass helps to create an open, airy floor plan, there appears to be an unintended consequence to all of the transparent walls.
As CBS San Francisco reports, employees are having difficulty seeing the glass walls and, as a result, are running into them, often times injuring themselves. That’s right, while some new buildings such as U.S. Bank Stadium in Minnesota have had issues with their extensive use of glass proving harmful to bird populations, Apple’s new campus is proving just as difficult to navigate for its human employees.
On more than one occasion calls have been placed to 911 describing employees that are bleeding or disoriented after colliding with the partitions. The current solution for the deleterious walls has been to stick small white stickers on the glass panes to help make them more visible. Whether a more permanent solution will be found remains to be seen.
Related Stories
| Oct 22, 2012
Two-Hour Curtain Wall Lets Light In and Keeps Fire Out at Prairie Hills Junior High School
New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.
| Jul 16, 2012
Business school goes for maximum vision, transparency, and safety with fire rated glass
Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.
| Jun 29, 2012
Guardian launches industry’s first glass visualizer for interior design
Online tool allows designers to explore the possibilities of glass.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| Jun 1, 2012
AIA 2030 Commitment Program reports new results
The full report contains participating firm demographics, energy reduction initiatives undertaken by firms, anecdotal accounts, and lessons learned.
| May 31, 2012
Product Solutions June 2012
Curing agents; commercial faucets; wall-cladding systems.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.