flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

University Buildings

New Blinn College Residence Hall hopes to decrease the size of the campus housing wait list

In 2016, more than 400 students were placed on the wait list due to lack of available on-campus housing.


By David Malone, Associate Editor | September 15, 2017
A rendering of the front of the new Blinn College residence hall

Rendering courtesy of Servitas.

Scheduled for completion for student move-in by fall 2018, a new four-story residence hall at Blinn College has recently broken ground in Brenham, Texas. In 2016, over 400 Blinn College students were put on the campus housing wait list. The new residence hall will help alleviate the stress on the school’s campus housing system.

The facility, located at the corner of Seager Street and Old Mill Road, will offer 464 suite-style beds and 9,000-sf of common space. Study spaces, an outdoor courtyard, and a large engineering classroom will all be included.

 

A rendering that shows the materials to be used for the Blinn College residence hallRendering courtesy of Servitas.

 

Each of the suite-style units will have their own bathroom. Two bedroom suites will have one bathroom while four-bedroom suites will be equipped with two bathrooms.

The project began construction on June 1, 2017 and is valued at $34 million. Kirksey Architecture designed the project and Moss & Associates is the general contractor. Servitas is the project’s developer.

Related Stories

University Buildings | Sep 28, 2021

Designing for health sciences education: Specialty instruction and human anatomy labs

It is a careful balance within any educational facility to provide both multidisciplinary, multiuse spaces and special-use spaces that serve particular functions.

University Buildings | Sep 7, 2021

Gateway to the West: Kansas City University Center for Medical Education Innovation

Kansas City University Center for Medical Education Innovation uses GKD Omega 1520 metal fabric.

Laboratories | Aug 31, 2021

Pandemic puts science and technology facilities at center stage

Expanding demand for labs and life science space is spurring new construction and improvements in existing buildings.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Giants 400 | Aug 26, 2021

2021 University Giants: Top architecture, engineering, and construction firms in the higher education sector

Gensler, AECOM, Turner Construction, and CannonDesign head BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

University Buildings | Aug 19, 2021

School of Medicine completes on California University of Science and Medicine’s new Colton campus

The project was designed and built to address critical public health needs in an underserved region.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

University Buildings | Aug 12, 2021

Central Michigan University’s Chippewa Champions Center completes

The project was designed in partnership between Populous and GMB Architecture + Engineering.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021