Cannabis Facility Construction (CFC), a full-service cannabis design-build construction firm based in Northbrook, Ill., has begun construction on a new recreational and medical cannabis dispensary for Greenhouse. The project, which is located at 755 Skokie Boulevard in Northbrook, will be a national flagship location for the brand.
Comprising 10,000 sf, the wood and masonry structure will have a modern, industrial design that will represent a new look for the Greenhouse brand. The space will have an open floor plan with vaulted ceilings, skylights and abundant natural light, and easy-to-browse product displays. The project was designed with social distancing in mind, ensuring all points of sale are six feet apart.
Â
See also:Â The coming bonanza in marijuana facilities
Retail space in the front of the building will be complemented by back office space for processing. A secure, oversized vault for substantial inventory storage and an advanced security system are also included. The facility’s exterior will feature natural landscaping, a retention pond, and a large parking lot, all revitalizing a location that has sat vacant for a long time.
Construction on the project, which will be Greenhouse’s largest dispensary to date, began in May.
Related Stories
| Feb 8, 2012
Mega-malls expanding internationally
Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.
| Jan 6, 2012
New Walgreen's represents an architectural departure
The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.
| Jan 6, 2012
Summit Design+Build completes Park Place in Illinois
Summit was responsible for the complete gut and renovation of the former auto repair shop which required the partial demolition of the existing building, while maintaining the integrity of the original 100 year-old structure, and significant re-grading and landscaping of the site.
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 29, 2011
Report finds credit crunch accounts for 20% of nation’s stalled projects
Persistent financing crunch continues to plague design and construction sector.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 26, 2011
Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.
New store features 1,200 sf fit out at Aventura Mall.
| Oct 3, 2011
Magellan Development Group opens Village Market in Chicago’s Lakeshore East neighborhood
Magellan Development Group and Hanwha Engineering & Construction are joint-venture development partners on the project. The Village Market was designed for Silver LEED certification by Loewenberg Architects and built by McHugh Construction.Â